Grouting method for strong weathered geological section
A strong weathering and grouting technology, used in construction, infrastructure engineering and other directions, can solve problems such as difficulty and difficulty in achieving water-stopping effect, and achieve the effect of improving water-stopping effect.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0024] A grouting method for strongly weathered geological sections, the specific steps are as follows:
[0025] Step 1: Drill the hole,
[0026] A steel casing is placed outside the drill bit of the drilling rig to form a drilling assembly, and the drilling rig is started to drill the drilling assembly from the soil layer into the strongly weathered fractured zone, and drill to the designed depth of the grouting hole at one time;
[0027] Step 2: Lower the grouting pipe,
[0028] After the drilling is completed, take out the drill bit from the steel casing, and lower the steel grouting pipe along the steel casing to the design depth of the grouting hole;
[0029] Step 3: cyclic grouting construction,
[0030] After pulling out the steel casing for a certain distance, grout the strongly weathered geological area corresponding to the drawn length through the grouting pipe. Grouting is carried out in the strongly weathered geological area corresponding to the length, and this...
Embodiment 2
[0041] A grouting method for strongly weathered geological sections, the specific steps are as follows:
[0042] Step 1: Drill the hole,
[0043] A steel casing is placed outside the drill bit of the drilling rig to form a drilling assembly, and the drilling rig is started to drill the drilling assembly from the soil layer into the strongly weathered fractured zone, and drill to the designed depth of the grouting hole at one time;
[0044] Step 2: Lower the grouting pipe,
[0045] After the drilling is completed, take out the drill bit from the steel casing, and lower the steel grouting pipe along the steel casing to the design depth of the grouting hole;
[0046] Step 3: cyclic grouting construction,
[0047] After pulling out the steel casing for a certain distance, grout the strongly weathered geological area corresponding to the drawn length through the grouting pipe. Grouting is carried out in the strongly weathered geological area corresponding to the length, and this...
Embodiment 3
[0058] A grouting method for strongly weathered geological sections, the specific steps are as follows:
[0059] Step 1: Drill the hole,
[0060] A steel casing is placed outside the drill bit of the drilling rig to form a drilling assembly, and the drilling rig is started to drill the drilling assembly from the soil layer into the strongly weathered fractured zone, and drill to the designed depth of the grouting hole at one time;
[0061] Step 2: Lower the grouting pipe,
[0062] After the drilling is completed, take out the drill bit from the steel casing, and lower the steel grouting pipe along the steel casing to the design depth of the grouting hole;
[0063] Step 3: cyclic grouting construction,
[0064]After pulling out the steel casing for a certain distance, grout the strongly weathered geological area corresponding to the drawn length through the grouting pipe. Grouting is carried out in the strongly weathered geological area corresponding to the length, and this ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More