Unlock instant, AI-driven research and patent intelligence for your innovation.

Masonry infilled wall constructional column formwork-erecting-free construction method, prefabricated module, and mold

A construction method and technology for constructing columns, which are applied to building structures, walls, building components, etc., can solve the problems of slow construction process, disturbed concrete, and high cost, and achieve the goal of avoiding common quality problems, speeding up project progress, and achieving accurate results. Effect

Pending Publication Date: 2021-04-30
GANSU THIRD CONSTR GROUP CORP
View PDF8 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] Masonry infill wall construction column is an essential part of every building in the construction industry. The traditional construction method of masonry infill wall construction column requires on-site fabrication, installation of steel skeleton, support formwork and reinforcement formwork, secondary pouring Concrete, formwork removal, maintenance and other complicated procedures consume a lot of materials and labor, high cost, slow construction process, and great safety hazards; in addition, traditional methods are likely to cause wall damage, disturbance and concrete in the process of pouring concrete. Quality problems such as vibration leakage, slurry leakage, and honeycomb pitting

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Masonry infilled wall constructional column formwork-erecting-free construction method, prefabricated module, and mold
  • Masonry infilled wall constructional column formwork-erecting-free construction method, prefabricated module, and mold
  • Masonry infilled wall constructional column formwork-erecting-free construction method, prefabricated module, and mold

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0033] In order to make the object, technical solution and advantages of the present invention clearer, the present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the present invention, not to limit the present invention.

[0034] The hollow prefabricated modules include U-shaped, T-shaped, L-shaped, cross-shaped, etc. The mold of the hollow prefabricated module is composed of an outer mold and an inner mold. The mold of the U-shaped hollow prefabricated module refers to Figure 1-2 , the outer mold includes front plywood 1, rear plywood 2, side plywood 3 and screw 4, the front and rear plywood and side plywood are all made of 15mm thick high-quality plywood, the front plywood 1, the rear plywood The plywood 2 and two side plywood 3 form a cuboid frame structure, and the two sides of the front plywood 1 and the back p...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a masonry infilled wall constructional column formwork-erecting-free construction method, a prefabricated module, and a mold. The method includes the steps that during construction, the hollow prefabricated module is manufactured, a steel wire mesh is arranged in the prefabricated module, the prefabricated module is fixed through a steel bar fixing part composed of four round steel bars, and masonry operation is conducted after the steel bars are bound; before the building of building blocks, a story pole is erected, the building of U-shaped hollow prefabricated modules of a constructional column is conducted firstly, then the building of the building blocks at the two sides is conducted, and the hollow prefabricated modules are built through combed joints; and a three-one bricklaying method is adopted in a masonry method, the masonry mortar strength is not lower than M7.5, segmented flow masonry construction is adopted, water is sprayed to wet the inner sides of the hollow prefabricated modules before concrete is poured, and constructional column fine aggregate concrete is poured. According to the masonry infilled wall constructional column formwork-erecting-free construction method, the prefabricated module, and the mold, the constructional column is constructed along with the masonry building blocks, and subsequent procedures such as plastering can be inserted in advance, so that the construction period can be effectively shortened, the project progress can be accelerated, and the construction cost can be reduced; and the surface of the formed constructional column is free of honeycombs, pitted surfaces, holes and the like, and the formed constructional column is attached to masonry modulus and width and has no concrete quality problems such as grout leakage and mold expansion.

Description

technical field [0001] The invention belongs to the technical field of building construction, and in particular relates to a formwork-free construction method, a prefabricated module and a mold for a structural column of a masonry filled wall. Background technique [0002] Masonry infill wall construction column is an essential part of every building in the construction industry. The traditional construction method of masonry infill wall construction column requires on-site fabrication, installation of steel skeleton, support formwork and reinforcement formwork, secondary pouring Concrete, formwork removal, maintenance and other complicated procedures consume a lot of materials and labor, high cost, slow construction process, and great safety hazards; in addition, traditional methods are likely to cause wall damage, disturbance and concrete in the process of pouring concrete. Quality problems such as vibration leakage, slurry leakage, and honeycomb pitting. Based on this, t...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E04B2/14E04B2/24E04G21/14
CPCE04B2/14E04B2/24E04G21/14
Inventor 杨荣辉王继明裴彦斌燕彦宁赵海芬
Owner GANSU THIRD CONSTR GROUP CORP