A New Method for Adjusting Water Injection Rate in Multi-layer Heterogeneous Sandstone Reservoirs During Ultra-high Water Cut Period

A technology for ultra-high water-cut stage and sandstone oil reservoirs, which is applied to the field of water injection rate adjustment in multi-layer heterogeneous sandstone reservoirs in ultra-high water-cut stage, can solve problems such as inaccurate water injection adjustment plans, and improve accuracy and performance. The effect of efficiency

Active Publication Date: 2022-04-26
DAQING OILFIELD CO LTD +1
View PDF12 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] The present invention aims to overcome the problem of inaccurate water injection adjustment scheme caused by the existing artificial empirical dynamic analysis-based adjustment method of layer water injection in the background technology, and provide a multi-layer heterogeneous sandstone reservoir with extra high water cut period A New Method for Adjusting the Water Injection Volume of Intervals

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A New Method for Adjusting Water Injection Rate in Multi-layer Heterogeneous Sandstone Reservoirs During Ultra-high Water Cut Period
  • A New Method for Adjusting Water Injection Rate in Multi-layer Heterogeneous Sandstone Reservoirs During Ultra-high Water Cut Period
  • A New Method for Adjusting Water Injection Rate in Multi-layer Heterogeneous Sandstone Reservoirs During Ultra-high Water Cut Period

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0050] The preferred embodiments of the present invention are described in detail below, but the present invention may be implemented in a variety of different ways according to the claims limitations and coverage.

[0051] Using a new method for adjusting the water injection of the stratified water injection well section of the super-layer heterogeneous sandstone reservoir in the ultra-high water-bearing period of the present invention, the present embodiment of a water injection well S29 in block Z of Daqing Changyuan Oilfield is adjusted by the water injection scheme of the layer section. The injection well S29 is currently divided into 6 layers, and the water injection volume of a single well is 135m 3 / d, the actual reservoir model of Block Z is established, and the oil saturation, layered water injection, oil production and liquid production volume of each small layer of S29 well are calculated by using the reservoir numerical simulation and the small layer utilization predi...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The present invention provides a new method for adjusting the water injection volume of multi-layer heterogeneous sandstone reservoirs during the ultra-high water-cut period, which is used to solve the inaccurate water injection adjustment scheme caused by the existing artificial empirical dynamic analysis-based adjustment method of water injection volume for layers The problem. Based on the quantitative evaluation of the production status of small layers, the present invention forms a layer water injection volume adjustment method that considers the remaining reserves of layers, relative water injection efficiency, water cut rising speed and reasonable injection-production ratio. The weight coefficient of each parameter is determined in stages, and the "four parameters" interval water injection volume adjustment model is established to realize the allocation and quantitative calculation of water injection well intervals. The new method for adjusting the water injection volume of the multi-layer heterogeneous sandstone reservoir during the ultra-high water-cut period can realize the allocation and quantitative calculation of the interval of the water injection well, and provides a new way for the optimal adjustment of the water injection during the ultra-high water-cut period.

Description

Technical field [0001] The present invention relates to the field of oil and gas field development, in particular to a new method for adjusting the amount of water injection in the layer segment of the ultra-high aquifer period of multi-layer heterogeneous sandstone reservoirs. Background [0002] Stratified water injection is an important means to alleviate the contradiction between layers and improve the utilization of oil reservoirs, and the rational allocation of water injection in each layer is crucial to the accurate development of oilfields. [0003] The determination of the amount of injection in the layer section is theoretically distributed according to the static parameters and the deployment of the well network, or only relies on the residual oil saturation obtained by the residual oil description technology to calculate the amount of the injection amount, but it is not applicable to the actual situation of the joint development of multiple oil layers in the producti...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Patents(China)
IPC IPC(8): E21B43/20E21B49/00G06F30/20
CPCE21B43/20E21B49/00G06F30/20
Inventor 单高军王承祥罗庆李菁尹淑敏穆文志王海涛梁鸿雁李贺赵凯鑫
Owner DAQING OILFIELD CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products