Resource occupation testing method and device of electric energy meter operating system and computer equipment

A system resource and operating system technology, which is applied to the resource occupancy test method of the electric energy meter operating system, the device and the field of computer equipment, can solve the problems of low accuracy and test error of the resource occupancy test results of the electric energy meter operating system, and achieve improvement Accuracy, the effect of reducing test error

Pending Publication Date: 2021-06-01
CHINA SOUTHERN POWER GRID DIGITAL GRID RES INST CO LTD
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, due to the limited personal experience of the staff, or the differences in the manual testing methods and testing procedures used by different people, it is easy to produce test errors, resulting in a relatively low accuracy rate of resource occupancy test results for the energy meter operating system.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Resource occupation testing method and device of electric energy meter operating system and computer equipment
  • Resource occupation testing method and device of electric energy meter operating system and computer equipment
  • Resource occupation testing method and device of electric energy meter operating system and computer equipment

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0076] In order to make the purpose, technical solution and advantages of the present application clearer, the present application will be further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the present application, and are not intended to limit the present application.

[0077] The resource occupation test method of the electric energy meter operating system provided by this application can be applied to such as figure 1 shown in the application environment. Wherein, the electric energy meter under test 102 communicates with the automatic test platform 104 through a serial port, the test application program 106 is loaded in the operating system of the electric energy meter under test 102, and the test application program 106 communicates with the automatic test platform 104 through the serial port. The test application program 106 receive...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a resource occupation testing method and device of an electric energy meter operating system and computer equipment. The method comprises: receiving a loading instruction sent by an automatic test platform, responding to the loading instruction, and loading a test application program into a to-be-tested electric energy meter operating system; after the loading is successful, controlling all processes of the operating system of the to-be-tested electric energy meter to stop according to the triggered process stop instruction; receiving a project test instruction sent by the automatic test platform, and obtaining a target test project carried by the project test instruction; and performing working condition simulation operation according to the target test item, obtaining system resource occupation data after the working condition simulation operation, and obtaining a resource occupation test result corresponding to the system resource occupation data. By adopting the method, various working conditions of the operating system running different services can be flexibly simulated, the resource occupation condition of the system can be automatically tested, the test error is reduced, and the accuracy of the resource occupation test result of the operating system of the electric energy meter is improved.

Description

technical field [0001] The present application relates to the technical field of electric power engineering, in particular to a resource occupation test method, device and computer equipment for an electric energy meter operating system. Background technique [0002] With the development of power engineering technology and the gradual application of electric energy meters or smart terminals in people's work and life, due to different actual application scenarios, such as extreme harsh environments or concurrent environments, the performance of the operating system carried by the electric energy meter The requirements are increasing day by day. [0003] In addition to the correctness of the basic functions, the operating system of the electric energy meter also needs to consider the availability and reliability of different actual situations such as severe conditions (or extreme conditions), critical conditions, and concurrent conditions. The time performance (such as respon...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & AuthorityApplications(China)
IPC IPC(8): G06F11/22
CPCG06F11/2273
Inventor张鑫刘林谢文旺何恒靖
OwnerCHINA SOUTHERN POWER GRID DIGITAL GRID RES INST CO LTD