Full-interpenetration construction method based on northern constructional engineering

A technology of construction engineering and construction method

Pending Publication Date: 2021-06-01
HEBEI CONSTR GRP CO LTD
View PDF2 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] When the traditional construction method is in the main stage, the follow-up work layering is unreasonable, and the construction efficiency is low, the construction period is long, and the construction quality is poor. For this reason, we propose a full interspersed construction method based on northern construction projects

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Full-interpenetration construction method based on northern constructional engineering
  • Full-interpenetration construction method based on northern constructional engineering

Examples

Experimental program
Comparison scheme
Effect test

Embodiment approach

[0050] As an embodiment of the present invention, in step (3), operation is decomposed as follows:

[0051]a. Indoor interspersed process content: actual structural measurement, explosion point closure, indoor drainage engineering, secondary structural engineering, flue installation, plastering engineering, water supply installation, electrical installation, floor heating coil, floor heating backfill, bathroom waterproofing;

[0052] b. The content of the external wall interpenetration process: anti-cracking of the bottom layer of the external wall + leveling putty + real stone paint, air-conditioning panels, protective railings for corridors, door and window engineering, decorative louvers, rainwater and condensation pipes;

[0053] c. Public area interspersed process content: masonry works, plastering works, wall bricks, floor bricks, stair step plastering, stair handrail installation, stairwell and public area ceiling putty, electrical engineering, fire protection engineerin...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to the technical field of buildings, and discloses a full-interpenetration construction method based on northern constructional engineering, which comprises the steps of interpenetration construction planning, interpenetration classification, process decomposition, establishment of a full-process interpenetration model, subpackaging unit selection, making of a subpackaging material production scheduling plan and acceptance interpenetration. According to the full-interpenetration construction method based on northern constructional engineering, the working efficiency can be improved, the procedure connection contradiction generated by blind interpenetration operation can be eradicated, the construction quality is stabilized, the construction period is shortened, the cost is saved, and the purpose of fine management is achieved.

Description

technical field [0001] The invention relates to the technical field of construction, and is specifically based on the full interspersed construction method of northern construction projects. Background technique [0002] Our country is one of the largest construction markets in the world. With the prosperity and activity of the construction market, the competition among construction enterprises is becoming more and more fierce, and the construction period management plays an increasingly important role in improving the comprehensive competitiveness of enterprises. Obviously, at the same time, construction period management also plays a fundamental role in the establishment of the operation and management system of the entire enterprise. [0003] The role and status of construction period management in project management is particularly important. Active and reasonable construction period management can not only improve work efficiency, but also play an important role in impr...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/10G06Q50/08E04G21/00
CPCG06Q10/103G06Q10/109G06Q50/08E04G21/00
Inventor 韩腾飞申晓刚王洪奎段杰伟
Owner HEBEI CONSTR GRP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products