Borehole stressmeter capable of accurately monitoring three-dimensional installation angle and use method thereof
A technology of drilling stress gauge and three-dimensional installation, which is applied in the direction of measuring devices, force/torque/work measuring instruments, instruments, etc., which can solve the problem of uneven bending of drilling holes, processing errors, and unfavorable monitoring of rockburst stress changes in coal mines. Early warning and other problems, to achieve the effect of quick adjustment angle, convenient installation and use, and guaranteed installation quality
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0038] The specific implementation manners of the present invention will be further described in detail below in conjunction with the accompanying drawings.
[0039] In order to understand the present invention better, below in conjunction with appendix Figure 1-5 The background technology will be further described.
[0040] like Figure 1-2 As shown, the borehole stress gauge generally adopts the oil pressure pillow type. In order to be able to monitor the change trend of the vertical stress of the coal body, the oil pressure pillow 2 must be installed horizontally in the coal body borehole 11 . The borehole stress gauge is generally installed in the borehole 11 of Φ42~45, and the depth of the hole is 8-25 meters. Connect the various components according to the diagram, push the drilling stress gauge to the specified hole depth and put it in place.
[0041] like image 3As shown, the conventional method is to use each push rod 12 with a length of 1 meter, insert the firs...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


