Soft soil foundation road reconstruction and extension project supporting and retaining structure and construction method
A technology of soft soil foundation and retaining structure, which is applied in the direction of basic structure engineering, roads, roads, etc., can solve the problems of excessive settlement difference between old and new roadbeds, excessive lateral deformation of new roadbeds, etc., and achieve the elimination of uneven settlement and good Effect of ground treatment and reduction of additional stress
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0049] This embodiment provides a support structure for road reconstruction and expansion projects on soft soil foundations, such as figure 1 As shown, it includes reinforced soil retaining wall, curtain pile 6, foundation pile and lightweight filler. The reinforced soil retaining wall is set on the outside of the newly built roadbed. The curtain pile 6 penetrates and widens the roadbed and foundation, and light filler is used for the back of the wall. backfill.
[0050]Further, the reinforced soil retaining wall includes a retaining wall panel 2 and a reinforcing strip 3, the retaining wall panel 2 is arranged vertically, and is used to support the retaining roadbed; the reinforcing strip 3 is used for lightweight filler reinforcement. like figure 2 As shown, the retaining wall panel 2 is composed of several panel blocks 10, and the height of the retaining wall panel 2 gradually increases with the increase of the filling height.
[0051] One end of the panel block 10 is pr...
Embodiment 2
[0067] This embodiment provides a construction method for the retaining structure of a road reconstruction and expansion project on a soft soil foundation, comprising the following steps:
[0068] Step 1: Prefabricate various components before construction, mainly including panel blocks 10, reinforcement strips 3, pipe piles 5, curtain piles 6 and middle tire fragments of tire soil filler 9.
[0069] Step 2: Level the site at the widened soft soil foundation, and excavate a 50cm trench.
[0070] Step 3: Excavate construction steps on the original roadbed slope, such as figure 1 As shown, the width of the construction steps is 2.5m and the height is 1.6m.
[0071] Step 4: Use mechanical drilling on the construction steps of the first and second floors, and cast in-situ CFG piles or plain concrete piles. The pile cross section is circular and the pile diameter is 0.8m.
[0072] Step 5: Construct pile holes on the widened soft soil foundation, lay out the pile position, hoist t...
PUM
| Property | Measurement | Unit |
|---|---|---|
| Particle size | aaaaa | aaaaa |
| Density | aaaaa | aaaaa |
| Contact angle | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More - R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com



