Multi-target task scheduling method for power cloud data center
A data center and task scheduling technology, applied in the field of power informatization, can solve the problems of data center heat dissipation, increased cost, waste of energy, etc., and achieves the effect of strong applicability, good effect and scientific method
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0029] The efficiency of the present invention is reflected in the total time for executing all the tasks submitted by the user, and the energy consumption is the energy consumed by the data center after these tasks are executed. The main idea is: firstly, build a data center multi-objective task scheduling model with the optimization goal of improving efficiency and reducing energy consumption; then, use the non-dominated sorting genetic algorithm with elitist strategy (NSGA-II) to solve the scheduling model; finally, get A series of non-inferior solution sets satisfying Pareto optimality.
[0030] see figure 1 , a multi-objective task scheduling method for an electric power cloud data center of the present invention, comprising the following steps:
[0031] 1) Establish a model, select variables to be optimized, optimize objectives and determine constraints;
[0032] 2) Set the initial variable and give the scope of the variable to be optimized;
[0033] 3) The variable t...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


