System and method for electrochemically repairing salt-corroded reinforced concrete by stages
A reinforced concrete and repair system technology, applied in building maintenance, construction, building construction, etc., can solve problems such as non-involvement, and achieve the effect of eliminating the risk of negative effects
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0032] The gap electrochemical repair system built in the embodiment of the present invention has a gap migration process as follows:
[0033] (1) After the interval electrochemical repair system is built, inject the concrete re-alkalization solution into the repair pool, inject the electro-migration rust-inhibiting solution into the migration liquid pool II, and inject the electro-desalination migration liquid into the migration liquid pool I;
[0034] (2) Send instructions through the processor to collect initial indicators such as the electrolytic coefficient, pH value, oxygen concentration, temperature and other initial indicators collected by the migration fluid monitor according to the data collector, and at the same time collect the concrete salt concentration and resistivity collected by the steel-concrete structure monitor , steel potential, current and other initial indicators; after that, the repair of the salt-corroded reinforced concrete structure begins; at this t...
Embodiment 2
[0039] The gap electrochemical repair system built in the embodiment of the present invention has a gap migration process as follows:
[0040] (1) After the interval electrochemical repair system is built, inject the electro-desalination transfer solution into the repair pool, inject the electro-migration antirust solution into the transfer solution pool I, and inject the concrete re-alkalization solution into the transfer solution pool II;
[0041] (2) Send instructions through the processor to collect initial indicators such as the electrolytic coefficient, pH value, oxygen concentration, temperature and other initial indicators collected by the migration fluid monitor according to the data collector, and at the same time collect the concrete salt concentration and resistivity collected by the steel-concrete structure monitor , steel potential, current and other initial indicators; then start to repair the structure of electric desalination; at this time, the current controll...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 
