A Y-shaped tunnel grouting structure and matching grouting method
A grouting and tunneling technology, which is used in tunnels, tunnel lining, earth drilling and mining, etc., can solve the problem that the secondary grouting structure and method are not reasonable enough, cannot effectively fill the back gap of the segment, and cannot solve the floating phenomenon of the segment, etc. problem, to increase the cost of grouting, the viscosity is large, and the grouting effect is good.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0034] Embodiment 1: A kind of grouting structure in tunnel excavation process, please refer to figure 1 and figure 2 , the embodiment of the present invention includes:
[0035] From the tunnel rock layer 6, it includes the rock layer 6, the grouting layer and the pipe layer 4 in sequence. The pipe layer 4 is provided with a grouting hole, and the grouting hole is grouted outward. The surface of the rock layer 6 is formed by synchronous grouting. A hard shell, forming a grouting layer between the hard shell and the segment layer 4; a pair of Y-shaped pre-grouting holes 2, Y The reserved hole 2 for grouting has two pipes for spraying slurry upward and downward; the reserved hole 2 for Y-shaped grouting sprays liquid A upward, and the reserved hole 2 for Y-shaped grouting sprays liquid B downward; Type grouting reserved hole 2 is movably connected to a grouting pipeline, and the other end of the pipeline is connected to a grouting machine injecting liquid A and liquid B resp...
Embodiment 2
[0057] Embodiment 2: A kind of grouting structure in the tunnel excavation process, please refer to figure 1 and figure 2 , the embodiment of the present invention includes:
[0058] From the tunnel rock layer 6, it includes the rock layer 6, the grouting layer and the pipe layer 4 in sequence. The pipe layer 4 is provided with a grouting hole, and the grouting hole is grouted outward. The surface of the rock layer 6 is formed by synchronous grouting. A hard shell, forming a grouting layer between the hard shell and the segment layer 4; a pair of Y-shaped grouting reserved holes 2, Y The reserved hole 2 for grouting has two pipes for spraying slurry upward and downward; the reserved hole 2 for Y-shaped grouting sprays liquid A upward, and the reserved hole 2 for Y-shaped grouting sprays liquid B downward; Type grouting reserved hole 2 is movably connected to a grouting pipeline, and the other end of the pipeline is connected to a grouting machine injecting liquid A and liqu...
Embodiment 3
[0072] Embodiment 3: A kind of grouting structure in the process of tunnel excavation, please refer to figure 1 and figure 2 , the embodiment of the present invention includes:
[0073] From the tunnel rock layer 6, it includes the rock layer 6, the grouting layer and the pipe layer 4 in sequence. The pipe layer 4 is provided with a grouting hole, and the grouting hole is grouted outward. The surface of the rock layer 6 is formed by synchronous grouting. A hard shell, forming a grouting layer between the hard shell and the segment layer 4; a pair of Y-shaped pre-grouting holes 2, Y The reserved hole 2 for grouting has two pipes for spraying slurry upward and downward; the reserved hole 2 for Y-shaped grouting sprays liquid A upward, and the reserved hole 2 for Y-shaped grouting sprays liquid B downward; Type grouting reserved hole 2 is movably connected to a grouting pipeline, and the other end of the pipeline is connected to a grouting machine injecting liquid A and liquid...