A construction method for the conversion process of tunnel inclined shaft and positive tunnel excavation
A technology for converting process and construction methods, applied in tunnels, tunnel linings, shaft equipment, etc., can solve problems such as unproposed construction methods, achieve fast implementation, strong system, and reduce surrounding rock disturbance
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0034] The technical solutions of the present invention are further described in detail below with reference to the accompanying drawings, but the protection scope of the present invention is not limited to the following.
[0035] like Figure 1 to Figure 4 As shown, a support structure for the conversion process of tunnel inclined shaft and main tunnel excavation, including inclined shaft tunnel structure for support, pilot pit support system, main tunnel structure, pre-reinforced structure and support structure at the intersection of inclined shaft and main tunnel ;
[0036] further, as figure 1As shown, the inclined shaft tunnel structure includes the initial branch 1 of the inclined shaft and the second lining 2 of the inclined shaft. The initial branch 1 of the inclined shaft is in contact with the tunnel wall of the supporting inclined shaft, and the second lining 2 of the inclined shaft is arranged on the outer wall of the initial branch 1 of the inclined shaft. To jo...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 