Prefabricated column and cast-in-place concrete structure sleeve inverted insertion type one-time grouting construction method

A construction method and technology of prefabricated columns, applied in structural elements, building components, building structures, etc., can solve problems affecting the fullness of prefabricated construction grouting, affecting the qualified rate of structural connection construction, and unfavorable air discharge.

Pending Publication Date: 2021-07-30
GUANGDONG IND EQUIP INSTALLATION
View PDF6 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

This kind of grouting is not conducive to the air discharge in the sleeve and the joint grouting process, which affects the fullness of the grouting in the prefabricated construction, and then affects the construction pass rate of the connection between the upper and lower structures, so it is necessary to improve

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Prefabricated column and cast-in-place concrete structure sleeve inverted insertion type one-time grouting construction method
  • Prefabricated column and cast-in-place concrete structure sleeve inverted insertion type one-time grouting construction method
  • Prefabricated column and cast-in-place concrete structure sleeve inverted insertion type one-time grouting construction method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0036] refer to Figure 1 to Figure 11 , a prefabricated column and cast-in-situ concrete structure sleeve reverse insertion type one-time grouting construction method, which includes the following steps:

[0037] Step 1, construction of cast-in-place concrete structure, please refer to figure 1 and figure 2 ;

[0038] The cast-in-place concrete structure includes a cast-in-place pile 2 with a reinforced concrete structure and a cast-in-place floor 4 positioned at the top of the cast-in-place pile 2; a plurality of cast-in-place pile reinforcements 21 and A number of cast-in-place pile stirrups 22 arranged horizontally, the inner top of the cast-in-place pile 2 is located at the upper end of the cast-in-place pile column reinforcement 21 and a sleeve 3 is installed. Flat, the upper and lower ends of the side wall of the sleeve 3 have an upper grout port and a lower grout port respectively; the cast-in-place floor 4 has floor steel bars laid horizontally; in this embodiment...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention provides a prefabricated column and cast-in-place concrete structure sleeve inverted insertion type one-time grouting construction method. The method comprises the steps that 1, a cast-in-place concrete structure is constructed, the cast-in-place concrete structure is provided with cast-in-place piles and a cast-in-place floor, sleeves are arranged at the upper ends of cast-in-place pile column ribs, cup openings of the sleeves are flush with the top end of the cast-in-place floor, the sleeves are provided with upper-end slurry openings and lower-end slurry openings, the cast-in-place piles are sequentially constructed, the sleeves are mounted, positioning plates at the upper ends of the sleeves are mounted and the cast-in-place floor is constructed; 2, the positioning plates are dismounted; 3, the limiting plates are constructed; 4, a prefabricated column is hoisted, a joint grout outlet pipe is arranged in the prefabricated column, connecting ribs are arranged at the lower ends of prefabricated column ribs and are inserted into the sleeves one by one; 5, the prefabricated column is supported; 6, grouting construction is conducted in the sleeves one by one, so that grouting materials overflow from a grout outlet pipe, and grouting is conducted on the last sleeve till the grouting materials are discharged from the joint grout outlet pipe; and 7, construction is completed. According to the construction method, air in the sleeves and a joint in assembly type construction can be discharged easily, grouting fullness is guaranteed, and the method has the advantages of being high in construction quality, good in effect and easy to operate.

Description

technical field [0001] The invention relates to the technical field of construction, in particular to a sleeve-inverted primary grouting construction method for a prefabricated column and cast-in-situ concrete structure. Background technique [0002] There are more or less cast-in-place concrete structures in the prefabricated building structure, and the connection forms between the cast-in-place concrete structure and the prefabricated components can be steel sleeve grouting connection, steel grout anchor lap joint and post-cast concrete steel bar lap joint. Compared with the other two overlapping methods, the steel sleeve grouting connection is superior to the other two in terms of mechanical properties of joints, construction quality control and reliability. Usually, in the steel bar sleeve grouting connection structure, the sleeve is located in the upper structure, the cup mouth is downward, the column bar is located in the lower structure, inserted into the sleeve upwar...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): E04B1/41E04C5/16E04G21/12
CPCE04B1/41E04B1/4121E04B1/4157E04C5/165E04G21/12
Inventor 颜海远万思宽陈跃黄浩华林雁黄俊文陈希日王方舟林坤阳刘远兴
Owner GUANGDONG IND EQUIP INSTALLATION
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products