Eureka AIR delivers breakthrough ideas for toughest innovation challenges, trusted by R&D personnel around the world.

Building engineering cost control system based on BIM model

A technology for construction engineering and construction cost, which is applied in the field of construction cost, can solve the problems of inability to analyze project cost management and control, and the accuracy and efficiency of cost control are not high, so as to achieve the effect of reducing construction cost and improving management efficiency

Pending Publication Date: 2021-08-17
重庆创新工程咨询有限公司
View PDF0 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] In order to solve the problem that the traditional project cost cost statistics method cannot effectively and perfectly control and analyze the project cost, resulting in low accuracy and efficiency of cost control cost, the present invention provides a BIM model-based construction project cost control system

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Building engineering cost control system based on BIM model
  • Building engineering cost control system based on BIM model
  • Building engineering cost control system based on BIM model

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0029] The following is attached Figure 1 to Figure 4 , to further describe this application in detail.

[0030] A BIM model-based construction project cost control system, including: design system 1, construction system 2, and operation and maintenance system 3; design system 1 includes sequentially connected analysis module 11, inspection module 12, acquisition module 13, and design collaboration Module 14. Wherein, the analysis module 11 performs an initial analysis on the energy consumption of the cost of the construction project based on the BIM model, and at the same time eliminates construction projects with excessively high or unreasonable costs. The interference checking module 12 is to carry out the interference checking on the analyzed data, obtain the inspection result, and carry out statistics on the quantity of the construction project at the same time; the acquisition module 13 acquires the plan drawing, the elevation drawing, the section of the building const...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a BIM model-based building engineering cost control system, which comprises a design system, a construction system and an operation and maintenance system. The design system comprises an analysis module, an inspection module, an acquisition module and a design collaboration module which are connected in sequence. The construction system comprises a collision checking module, a simulation construction module and a three-dimensional rendering module which are connected in sequence. The operation and maintenance system comprises a space management module, a facility management module and a hidden project management module which are connected in sequence, and the space management module is used for obtaining space position information of fire fighting equipment and converting the space position information into a three-dimensional graphic position; the facility management module is used for maintaining various facilities; and the hidden project management module is used for acquiring pipeline information based on a BIM model, and carrying out maintenance or equipment replacement on a damaged pipeline or line. According to the invention, the problem that the existing project cost management and control precision and efficiency are not high is solved.

Description

technical field [0001] The invention relates to the technical field of engineering cost, in particular to a control system for construction engineering cost based on a BIM model. Background technique [0002] Project cost refers to the construction cost that constitutes the project's estimated or actual expenditure during the construction period. With the development of the national economy, the number and scale of engineering construction projects are increasing day by day. The regional competition of engineering construction projects is fierce, and the product differentiation of projects is obvious. The quality and comprehensive benefits of construction put forward higher requirements. [0003] With the gradual promotion of BIM technology in construction engineering, more and more design units, construction units and construction units have begun to apply this technology to the construction of engineering projects, which has become the development trend of building informa...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06Q10/10G06Q10/00G06F30/13G06Q30/02G06Q50/08
CPCG06Q10/103G06Q10/20G06Q30/0206G06Q50/08G06F30/13
Inventor 赵邦君李占环
Owner 重庆创新工程咨询有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Eureka Blog
Learn More
PatSnap group products