Method for detecting reasons for unbalanced stress of guide bearing of vertical water-turbine generator set
A technology of generator sets and guide bearings, which is applied in the direction of mechanical bearing testing, engine components, machines/engines, etc., can solve problems such as time-consuming and labor-intensive, and cannot meet timely detection, so as to reduce losses, avoid economic losses, and prevent accidents from expanding Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0041] A power plant No. 1 unit is a vertical hydraulic generator set with a rated power of 250WM and a rated speed of 125 rpm and a rated excitation current of 1740A.
[0042] After the power generation unit is overhaul, the relevant data is recorded since the start of the generator set, and the relevant data is recorded, and whether the various conduit bearing capacity is imbalance, due to the construction of the hydraulic generator set, lead, water guide three The road lead bearing is similar, and the reason for the imbalance is similar, and therefore, the detection method of the upper guide, the lead is guided, the water guide bearing is generally, and the first embodiment is only the upper conductive axis of the generator set. Whether it is not balanced, and the remaining leading, the detection of the force imbalance of the water guide bearing is identical to the above-mentioned steps, and the specific detection method includes the following steps:
[0043] 1) From the start ...
Embodiment 2
[0067] The No. 4 generator set of a power plant is a vertical hydraulic generator set, the rated power is 350Wm, the rated speed is 75 rpm, the rated excitation current is 2650A, and the generator sets have been recorded during the promotion unit test, and record the relevant data of the upper conductive bearing , The detection force is imbalance, the detection method includes the following steps:
[0068] 1) Since the start of the generator set in 0-1 hours, every 5-6 seconds from the existing generator set online monitoring system acquisition unit, the peak value, the upper guide bearing, 1 times the upper guide bearing Value Y 1 , The unit load projection P, the speed N, the exit circuit breaker position, the upper end surface temperature T of the shaft, as follows:
[0069]
[0070]
[0071]
[0072] Note: The unit speed N is indicated by a percentage, 100% represents the rated speed; the rated excitation current is 2650A, the excitation current I is less than 10a, indic...