Glass curtain wall construction method
A technology of glass curtain wall and construction method, which is applied to the device, construction, coating and other directions of coating liquid on the surface, can solve the problems of low construction efficiency, high physical strength, limited construction position adjustment, etc., saving manpower and material resources, operation Simple, fast and efficient
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0043] The embodiments of the present invention will be described in detail below with reference to the accompanying drawings, but the present invention can be implemented in many different ways defined and covered by the claims.
[0044] Such as Figure 2 to Figure 14Shown, a kind of glass curtain wall construction method, it has used glass curtain wall construction equipment, and this equipment comprises base 10 and the riser 12 that sliding fit is connected on the top center of base 10, and the bottom of base 10 is provided with roller, and the top center of base 10 A T-shaped slot 101 is provided, and the inside of the T-shaped slot 101 is slidably connected with a T-shaped slider. Screw rod 11, the outer wall of the moving screw rod 11 runs through the side wall of the T-shaped slider and is connected with the T-shaped slider through a threaded fit. One end of the moving screw rod 11 runs through to the right end of the base 10 and is fixedly connected to a crank handle ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


