A model material and model technology, applied in the field of data analysis, can solve the problems of lack of guarantee of effect, affecting the rendering effect and functionality of buildings, etc., to ensure the effect of rendering effect and function.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0033] Such as figure 1 As shown, the embodiment of the present application provides a method for invoking interchangeable decoration materials based on a BIM model, and the method includes:
[0034] Step S100 obtains a first model, and the first model is a BIM model;
[0035] Step S200 obtains the first model structure information, and the first model structure information includes multiple structures;
[0036] Specifically, the first model is the building BIM model that needs to be replaced and transferred, which includes the structural information of the building. There are various structures in the first model structure information, including the various partitions of the building corresponding to the first model. Information, feature information, structure information, area information, etc., that is, to refine the overall structure of the building.
[0037] Step S300 Obtain first model material information according to the first model structure information, the first m...
Embodiment 2
[0064] Based on the same inventive concept as the method for calling interchangeable decoration materials based on the BIM model in the foregoing embodiments, the present invention also provides a system for calling interchangeable decoration materials based on the BIM model, such as Figure 5 As shown, the system includes:
[0065] A first obtaining unit 11, the first obtaining unit 11 is used to obtain a first model, and the first model is a BIM model;
[0066] A second obtaining unit 12, the second obtaining unit 12 is configured to obtain first model structure information, and the first model structure information includes multiple structures;
[0067] A third obtaining unit 13, the third obtaining unit 13 is configured to obtain first model material information according to the first model structure information, the first model material information includes various materials corresponding to the various structures ;
[0068] A fourth obtaining unit 14, the fourth obtain...