Bridge lifting device and construction method
A lifting device and bridge technology, applied in bridges, bridge construction, erection/assembly of bridges, etc., can solve problems such as mismatch between hoops and bridge piers
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0043] The embodiment of the present application discloses a bridge lifting device. refer to figure 1 with figure 2, a bridge lifting device includes two beam-lifting mechanisms for lifting bridge sections 23, at least two construction hangers 1 and a lifting device for lifting the construction hangers 1, the beam-lifting mechanism includes a lifting frame, a continuous jack and a steel strand Line, by setting two lifting frames on both sides of the bridge section 23 to be lifted respectively, the bridge section 23 is lifted by continuous jacks and steel strands, and the bottom of the bridge section 23 is temporarily lifted after the bridge section 23 is lifted. Support, after the support is completed, use the lifting device to lift the construction hanger 1 to the installation position.
[0044] refer to figure 2 with image 3 The construction hanger 1 includes two detachable half-frame bodies 2, the half-frame body 2 includes a bracket 3 and a hoop 4 for holding the pi...
Embodiment 2
[0054] The embodiment of the present application also discloses a construction method for bridge lifting, referring to Fig. 6, comprising the following steps,
[0055] S1. Lifting the bridge segment 23, moving the two beam lifting mechanisms to both sides of the bridge to be lifted, temporarily supporting the bottom of the lifting bridge segment 23 after completion, and then lifting the next bridge node;
[0056] S2. Prepare the half-frame body 2 and the matching hoop frame 4. By docking the fixed rod 6 with the threaded rod 5, the threaded sleeve 7 is threadedly connected with the threaded rod 5. When the clamping ring 8 moves to abut against the abutment plate 9 , complete the connection of hoop frame 4 and support 3;
[0057] S3, suspending the half-frame body 2, hanged by the chain of the hook 19 and the electric chain hoist 17, under the elastic force of the torsion spring 20, the abutment rod 18 resets to block the opening of the hook 19, ensuring that the hook 19 and t...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap