[0028] refer to Figure 1-7 , heat dissipation copper block testing machine, including a base 1, a water storage chamber 5 is provided inside the base 1, a first temperature sensor 4 is arranged on the bottom inner wall of the water storage chamber 5, and two heaters are symmetrically arranged on the bottom inner wall of the water storage chamber 5 3. The top of the base 1 is fixedly connected with a connection seat 9, the connection seat 9 is a hollow structure, the connection seat 9 is fixedly embedded with a heating sheet 2, and the inner wall of the bottom of the water storage chamber 5 is fixedly connected with a plurality of heat conduction pipes 6, a plurality of The top of the heat pipe 6 extends to the top of the base 1 and is fixedly connected to the bottom of the heating sheet 2. The top of the base 1 is symmetrically provided with two mounting seats 13. The mounting seats 13 are hollow structures, and the two mounting seats 13 are connected through a sliding connect...
Embodiment 2
[0030] Further improved on the basis of embodiment one: with reference to Figure 1-7, heat dissipation copper block testing machine, including a base 1, the interior of the base 1 is provided with a water storage chamber 5, the water storage chamber 5 is connected with a water injection pipe 10, and the top side of the base 1 is symmetrically fixedly connected with two connecting plates 11, two The same cover 12 that seals the water injection pipe 10 is rotatably connected between the connecting plates 11. By opening the cover 12, clean water can be injected into the water injection pipe 10 into the water storage chamber 5, and the water storage chamber 5 is connected. There is a water outlet pipe 36, a valve is installed on the water outlet pipe 36, a first temperature sensor 4 is arranged on the bottom inner wall of the water storage chamber 5, two heaters 3 are symmetrically arranged on the bottom inner wall of the water storage chamber 5, and the top of the base 1 is fixed...