Bridge pile and supporting steel sheet pile synchronous construction method

A technology of simultaneous construction and steel sheet piles, applied in sheet pile walls, excavation, infrastructure engineering, etc., can solve the problems of prolonged construction period of steel sheet piles, difficult application of construction projects, limited construction of steel sheet piles, etc., so as to reduce the supporting structure. Cost, high work efficiency, and the effect of improving construction efficiency

Active Publication Date: 2021-12-03
CCCC SECOND HARBOR ENG
View PDF5 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003]On the premise that the bearing capacity and overall stability of steel sheet piles meet the design requirements, steel sheet pile support is popular due to its advantages of low cost, material turnover and convenient construction , but under the condition of soil strata (including boulders), the construction of steel sheet piles is limited, and the construction period of steel sheet piles will be greatly extended.
Other deep foundation pit steel sheet piles (such as row piles (bored piles) support, row piles + water-stop curtain support, SMW pile support, etc.) have high costs and long construction periods. It is difficult to apply to construction projects with a large amount of structural engineering

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Bridge pile and supporting steel sheet pile synchronous construction method
  • Bridge pile and supporting steel sheet pile synchronous construction method
  • Bridge pile and supporting steel sheet pile synchronous construction method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0032] The present invention will be further described in detail below in conjunction with the accompanying drawings, so that those skilled in the art can implement it with reference to the description.

[0033] The following description serves to disclose the present invention to enable those skilled in the art to carry out the present invention. The preferred embodiments described below are only examples, and those skilled in the art can conceive of other obvious modifications. The basic principles of the present invention defined in the following description can be applied to other embodiments, variations, improvements, equivalents and other technical solutions without departing from the spirit and scope of the present invention.

[0034] Those skilled in the art should understand that in the disclosure of the present invention, the terms "vertical", "transverse", "upper", "lower", "front", "rear", "left", "right", " The orientation or positional relationship indicated by ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a bridge pile and supporting steel sheet pile synchronous construction method. The method comprises the following steps that S1, bridge piles are divided into a plurality of to-be-constructed bridge piles A and a plurality of constructed bridge piles B, and the to-be-constructed bridge piles A and the to-be-constructed bridge piles B are distributed at intervals; and S2, a drilling machine is moved to the position of one to-be-constructed bridge pile A, and the to-be-constructed bridge pile A is constructed, and meanwhile, the end, away from the to-be-constructed bridge pile A by the preset distance, of the bridge pile A is selected as a steel sheet pile driving starting point, and steel sheet pile driving is conducted within the preset range from the steel sheet pile driving starting point. According to the construction method, the steel sheet piles and part of the bridge piles are constructed at the same time in a sectioned mode, construction of the steel sheet pile supporting structure is completed while construction of all the bridge piles is completed, multiple working faces are constructed at the same time, and the production efficiency is greatly improved.

Description

technical field [0001] The invention relates to the field of bridge foundation construction. More specifically, the present invention relates to a method for synchronous construction of bridge piles and steel sheet piles. Background technique [0002] In recent years, in the process of bridge foundation construction at home and abroad, for different geological conditions, the main forms of land bridge buried cap deep foundation pit support are: row pile (bored pile) support, steel sheet pile support, Underground Diaphragm Wall Support, Pile Row + Waterstop Curtain Support, SMW Construction Method Pile Support, etc. And the general construction sequence of bridge land foundation is: bored pile construction → foundation pit support construction → foundation pit excavation → platform cap construction, in which bridge piles and steel sheet piles are constructed in sequence. [0003] Under the premise that the bearing capacity and overall stability of steel sheet piles meet the...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E02D7/02E02D7/20E02D5/22E02D5/04E02D17/04
CPCE02D7/02E02D7/20E02D5/22E02D5/04E02D17/04
Inventor 代岳龙何深同文敬华别亚威孙敏李丹曾宪友蒋梦川刘康明启盟董景春余鹏张佳伟刘剑桥
Owner CCCC SECOND HARBOR ENG