Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Composite asphalt modifier, composite modified asphalt and production process of composite asphalt modifier and composite modified asphalt

A technology of composite modified asphalt and composite asphalt, which is applied in the direction of building components, building insulation materials, buildings, etc., can solve the problems of poor storage stability, easy sinking, poor compatibility of asphalt and rubber powder, etc., and achieve production The process is simple and the effect of expanding the scope of use

Active Publication Date: 2014-12-10
广西国创道路材料有限公司 +1
View PDF12 Cites 7 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The softening point and ductility of this ordinary waste rubber powder modified asphalt are low, so adding modifiers such as SBS and various additives to compound modified asphalt in the waste rubber powder makes the softening point and ductility of the asphalt greatly improved. Improvement: There are many patents for compound modified asphalt related to rubber powder / SBS at home and abroad, such as CN102181163 A with a rubber powder content of 15-25%, CN 101555355 B with a rubber powder content greater than>50%, and CN 101985524 A The rubber powder content of CN 103059591 A is 35%, the rubber powder content of CN 103059591 A is 10-15%, the rubber powder content of CN 101717586 A is 30-50%, and the rubber powder content of CN 102993757 A is 20-60%. The performance index of composite modified asphalt with high powder parameter as the main factor and SBS low parameter as supplement is closer to the performance index of rubber asphalt, which is far from the performance index of polymer modified asphalt I-D, and due to the compatibility of asphalt and rubber powder Not good, prone to sinking, poor storage stability
And the rubber powder content of CN1609165 is 1~6%, the composite modified asphalt of this low rubber powder parameter, only the preparation and stability of rubber powder composite modified asphalt have been studied, solved the problem of storage stability, but The performance index of rubber powder compound modified asphalt has not been studied, and its performance index cannot reach the performance index of polymer modified asphalt I-D

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Composite asphalt modifier, composite modified asphalt and production process of composite asphalt modifier and composite modified asphalt

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0030] First, prepare composite asphalt: blend 78 parts of asphalt b, 18 parts of natural asphalt, and 1 part of emulsified asphalt at a temperature of 120-130°C, premix, precipitate, and filter to prepare composite asphalt.

[0031]Next, prepare the composite asphalt modifier: put 29 parts of asphalt a, 35 parts of SBS, 9 parts of activated rubber powder, and 20 parts of rubber oil slurry into an internal mixer at 80-120°C for 20 minutes, and then pass through a double-mixer at 100-120°C Composite asphalt modifier was prepared by screw extrusion. Among them, the composite asphalt modifier contains 37.6% of SBS and 9.7% of activated rubber powder.

[0032] Thirdly, prepare the modified masterbatch: add 16.0 parts of composite asphalt modifier to 84.0 parts of asphalt a at 180-190° C., circulate rubber mill or cut it once to prepare the modified masterbatch. The modified masterbatch contains 6% of SBS and 1.55% of activated rubber powder.

[0033] Again, one dilution: Add 32....

Embodiment 2

[0037] First, prepare composite asphalt: blend 79 parts of asphalt b, 19 parts of natural asphalt, and 1 part of emulsified asphalt at a temperature of 120-130°C, premix, precipitate, and filter to prepare composite asphalt.

[0038] Next, prepare the composite asphalt modifier: put 29 parts of asphalt a, 36 parts of SBS, 9 parts of activated rubber powder, and 21 parts of rubber oil slurry into an internal mixer at 80-120 ° C for 20 minutes, and then pass through a 100-120 ° C double Composite asphalt modifier was prepared by screw extrusion. Among them, the composite asphalt modifier contains 37.9% of SBS and 9.5% of activated rubber powder.

[0039] Thirdly, prepare the modified masterbatch: add 17.2 parts of composite asphalt modifier to 2.8 parts of asphalt a at 180-190°C, circulate the rubber mill or cut it once to prepare the modified masterbatch. The modified masterbatch contains 6.5% of SBS and 1.63% of activated rubber powder.

[0040] Again, one dilution: Add 34.8...

Embodiment 3

[0044] First, prepare composite asphalt: blend 79 parts of asphalt b, 19 parts of natural asphalt, and 2 parts of emulsified asphalt at a temperature of 120-130°C, premix, precipitate, and filter to prepare composite asphalt.

[0045] Next, prepare the composite asphalt modifier: put 30 parts of asphalt a, 40 parts of SBS, 10 parts of activated rubber powder, and 23 parts of rubber oil slurry into an internal mixer at 80-120 ° C for 20 minutes, and then pass through a 100-120 ° C double Composite asphalt modifier was prepared by screw extrusion. Among them, the composite asphalt modifier contains 38.8% of SBS and 9.7% of activated rubber powder.

[0046] Thirdly, prepare the modified masterbatch: add 19.1 parts of composite asphalt modifier to 80.9 parts of asphalt a at 180-190° C., circulate rubber mill or cut it once to prepare the modified masterbatch. The modified masterbatch contains 7.4% of SBS and 1.85% of activated rubber powder.

[0047] Again, one dilution: add 35....

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a composite asphalt modifier, composite modified asphalt and a production process of the composite asphalt modifier and the composite modified asphalt. The composite asphalt modifier is prepared from the following components in parts by weight: 29-30 parts of asphalt a, 35-42 parts of SBS, 9-11 parts of activated rubber powder and 20-24 parts of rubber oil slurry, wherein the rubber powder is centralized in stress when being stressed in an asphalt base body. The production process of the composite modified asphalt comprises the following steps: adding 16.0-20.4 parts of composite asphalt modifier into 79.6-84.0 parts of the asphalt a at 180-190 DEG C to circularly glue or shear once to prepare modified masterbatch; dilution for the first time: adding 32.90-36.88 parts of asphalt a at 140-160 DEG C, 0.13-0.27 part of additive and 0.27-0.37 part of stabilizer into 62.5-66.7 parts of modified masterbatch, and fully stirring and developing for 2-3 hours to prepare mixed asphalt; dilution for the second time: adding 20-25 parts of composite asphalt at 130-150 DEG C into 75-80 parts of mixed asphalt, and stirring and developing for 0.5-1 hour to obtain the composite modified asphalt. The composite modified asphalt has weather resistance, good adhesion and low cost, and performance indexes accord with the I-D standard of polymer modified asphalt.

Description

technical field [0001] The invention relates to the technical field of modified asphalt, in particular to a composite asphalt modifier, a composite modified asphalt and a production process thereof. Background technique [0002] SBS / rubber powder composite modified asphalt is a method of using SBS and rubber powder as two polymer modifiers for asphalt modification at the same time. SBS is a block copolymer of styrene and butadiene. The physical crosslinking of styrene segment can improve the high temperature permanent deformation resistance of asphalt, while the butadiene segment endows asphalt with certain flexibility. This special structure makes SBS modified asphalt have good high and low temperature performance. Higher parameters of SBS modified asphalt pavement can greatly improve the performance of base asphalt, but SBS is expensive. If the cost is controlled and the parameters are reduced, the low-temperature brittleness will be relatively large, and the anti-aging a...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): C08L95/00C08L53/02C08L21/00C08K3/32C08K3/06
Inventor 范春华陈亮涂娟吕华生仲春南张明陈颖娣余春林张树领章波
Owner 广西国创道路材料有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products