Double-unit control method and system and special air conditioner
A control method and control system technology, which is applied in the field of electronic control equipment, can solve the problems of unreliable switching of dual units, and achieve the effects of high success rate of unit switching, strong anti-interference ability, and reliable system
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0070] figure 1 is a flow chart of a dual-unit control method shown according to an exemplary embodiment, the method is applied to the first unit, such as figure 1 As shown, the method includes:
[0071] Step S11, detecting the running state of the first unit;
[0072] Step S12, when the operating state of the first unit is on, and the operating state needs to be switched from on to off, output a switch signal to the second unit through the first switch element, so that the second unit detects the switch start after the signal, and feed back another switch signal through the second switch element after normal start;
[0073] Step S13, after receiving the switch signal fed back by the second unit, shut down the first unit;
[0074] The first switching element is connected between the output end of the first set and the input end of the second set;
[0075] The second switching element is connected between the output of the second group and the input of the first group.
[...
Embodiment 2
[0096] Figure 4 is a schematic block diagram of a unit control system 100 shown according to an exemplary embodiment, such as Figure 4 As shown, the system 100 includes:
[0097] A detection module 101, configured to detect the operating state of the first unit;
[0098] The output module 102 is configured to output a switching signal to the second unit through the first switch element when the operating state of the first unit is on and the operating state needs to be switched from on to off, so that the second unit detects Start starting after the switching signal, and feed back another switching signal through the second switching element after normal starting;
[0099] The switching module 103 is configured to close the first unit after receiving the switch signal fed back by the second unit;
[0100] The first switching element is connected between the output end of the first set and the input end of the second set;
[0101] The second switching element is connected...
Embodiment 3
[0112] Figure 5 is a flow chart of a dual-unit control method shown according to another exemplary embodiment, the method is applied to the second unit, such as Figure 5 As shown, the method includes:
[0113] Step S21, detecting the running state of the second unit, and whether the input terminal connected to the first switching element receives the switch signal sent by the first unit;
[0114] Step S22, when the operating state of the second unit is off and the switch signal sent by the first unit is received, the second unit is started, and after the second unit starts normally, another switch signal is fed back through the second switch element, so that the first unit closes the first unit after receiving the feedback switch signal;
[0115] The first switching element is connected between the output end of the first set and the input end of the second set;
[0116] The second switching element is connected between the output of the second group and the input of the ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


