Construction method of foundation pit supporting structure combining soil retaining, back pressure and cable-stayed support
A foundation pit support and construction method technology, which is applied in the direction of foundation structure engineering, excavation, sheet pile walls, etc., can solve the problems of occupying space, cannot provide enough space, and is not widely used, so as to achieve reasonable structure and save internal support , the effect of convenient installation
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0047] The foundation pit support structure of the anti-pressure cable-stayed bracing combined type of left soil includes a cable-stay system, a crown beam 2, a water-stop enclosure body 7, a soil-retaining area 8, a steel concrete floor-26 and an excavation area The top of the water-stop enclosure 7 is provided with a crown beam 2, and a connection reinforcement cage 6 is provided between the crown beam 2 and the water-stop enclosure 7, and the crown beam 2 is arranged in the original soil layer 1, so The soil retention area 8 is set between the water stop enclosure 7 and the excavation area, the side of the steel concrete bottom plate 26 is provided with a connection ear plate 5 25, and the steel concrete bottom plate 1 26 is arranged at the bottom 35 of the foundation pit, The cable stay system includes a reserved anchor hole 3, an upwardly inclined anchor 4, a downwardly inclined anchor 5, a support 9, an anchor head 10, a connecting ear plate 11, a stay cable 12, a connect...
Embodiment 2
[0057] The construction method of the foundation pit support structure of the described back pressure cable-stayed bracing combined type of left soil comprises the following steps:
[0058] 1) if image 3 As shown, the construction of the water-stop enclosure 7 and the crown beam 2: According to the engineering design, the concrete mixing pile construction is carried out around the pre-excavated foundation pit. Concrete pouring is carried out to form the water-stop enclosure 7 of the foundation pit, and then the connecting reinforcement cage 6 on the top of the water-stop enclosure 7 is lapped to bind the steel bars, and two upper and lower anchor holes 3 are reserved, and finally Pour concrete to form the crown beam 2 integrated with the waterstop enclosure 7;
[0059] 2) Excavation construction in excavation area 127: after the construction of waterstop enclosure 7 and crown beam 2 is completed, then excavate the earth in excavation area 127 within the scope of the foundati...