Rubber plug and bump pressure tool comprising same and used for oil pipe well cementation
A technology for rubber plugs and tubing, applied in the field of oil and gas well cementing, can solve problems such as affecting the opening of sliding sleeves and backflow of cement slurry, and achieve the effects of avoiding backflow, improving cementing quality, and ensuring wellbore quality.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0029] The present invention will be further described below in conjunction with accompanying drawing.
[0030] figure 1 A rubber stopper 100 according to the invention is shown. Such as figure 1 As shown, the rubber plug 100 includes a rubber plug core 1 , a cup 2 and a first locking member 3 . Wherein, the rubber plug core 1 is in the shape of a rod, which can play the role of skeleton and support. And, from bottom to top, the rubber plug core 1 has an insertion head 11 , a main body 12 and a connection tail 13 fixedly connected in sequence. An annular installation groove 14 is provided on the outer wall of the insertion head 11 . The leather cup 2 is sleeved on the outer wall of the connecting tail 13, and is used to scrape off the cement slurry by contacting the inner wall of the oil pipe 200 during the displacement process. The first locking member 3 is disposed in the installation groove 14 . After the cementing cement grouting is completed, the above-mentioned rub...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


