Reservoir engineering concrete precast block ecological slope protection construction method
An ecological slope protection and construction method technology, applied in water conservancy projects, sea area engineering, botanical equipment and methods, etc., can solve problems affecting the stability of the slope of the reservoir dam, disconnection, soil erosion of the slope structure, etc., to avoid Birds feed on seeds, reduce evaporation, reduce the effect of rainwater wash-off
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0029] The technical solutions of the present invention will be further specifically described below through examples.
[0030] A construction method for ecological slope protection of concrete prefabricated blocks in reservoir engineering;
[0031] The specific operation steps are as follows:
[0032] S1. Reservoir slope pretreatment: clean up the vegetation junction above the opening line of the dam slope, and clean up the width of 1.5m-2m (adjust the width according to the actual situation on site). Weeds, fallen leaves and dead branches, floating soil and pumice, etc. At the same time, potholes on the slope of the dam body are artificially filled and watered and tamped. Guarantee of deviations between them, reducing the difficulty of operation during the installation of concrete prefabricated blocks in the later stage;
[0033] S2. Set up water channels. After the slope of the dam body is leveled, it is necessary to set up cut-off drainage ditches at the junction of the ...