Optimization scheduling method for multi-target multi-mode intelligent switching of cascade hydropower station group
A cascade hydropower station group and optimal scheduling technology, applied in design optimization/simulation, constraint-based CAD, forecasting, etc., can solve problems such as low computing efficiency, improve computing efficiency, reduce repetitive work, and improve water energy utilization and power generation benefits
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0065] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments. The following examples are only used to illustrate the technical solution of the present invention more clearly, but not to limit the protection scope of the present invention.
[0066] Such as figure 1 As shown, an optimal scheduling method for multi-objective multi-mode intelligent switching of a cascade hydropower station group provided by an embodiment of the present invention specifically includes the following steps:
[0067] S1. For all dispatching requirements and business scenarios of cascade hydropower station groups, develop a variety of optimal dispatching modes, including several single-objective dispatching modes and multi-objective dispatching modes;
[0068] The single-objective scheduling mode includes the maximum power generation mode, the maximum power generation benefit mode, the maximum energy storage mode, the minimum water...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


