Unlock instant, AI-driven research and patent intelligence for your innovation.

Optimization scheduling method for multi-target multi-mode intelligent switching of cascade hydropower station group

A cascade hydropower station group and optimal scheduling technology, applied in design optimization/simulation, constraint-based CAD, forecasting, etc., can solve problems such as low computing efficiency, improve computing efficiency, reduce repetitive work, and improve water energy utilization and power generation benefits

Pending Publication Date: 2022-02-08
GUIZHOU WUJIANG HYDROPOWER DEV
View PDF0 Cites 5 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] Purpose of the invention: The purpose of the present invention is to provide an optimal dispatching method for multi-objective multi-mode intelligent switching of cascade hydropower station groups, which can intelligently switch the optimal dispatching mode according to the optimal dispatching requirements of cascade hydropower station groups in the river basin, so as to solve the problems existing in traditional power station dispatching methods Low Computational Efficiency Problem

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Optimization scheduling method for multi-target multi-mode intelligent switching of cascade hydropower station group
  • Optimization scheduling method for multi-target multi-mode intelligent switching of cascade hydropower station group
  • Optimization scheduling method for multi-target multi-mode intelligent switching of cascade hydropower station group

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0065] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments. The following examples are only used to illustrate the technical solution of the present invention more clearly, but not to limit the protection scope of the present invention.

[0066] Such as figure 1 As shown, an optimal scheduling method for multi-objective multi-mode intelligent switching of a cascade hydropower station group provided by an embodiment of the present invention specifically includes the following steps:

[0067] S1. For all dispatching requirements and business scenarios of cascade hydropower station groups, develop a variety of optimal dispatching modes, including several single-objective dispatching modes and multi-objective dispatching modes;

[0068] The single-objective scheduling mode includes the maximum power generation mode, the maximum power generation benefit mode, the maximum energy storage mode, the minimum water...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses an optimization scheduling method for multi-target multi-mode intelligent switching of a cascade hydropower station group. The method comprises the following steps: S1, for all scheduling requirements and business scenes of a cascade hydropower station group, developing a plurality of optimization scheduling modes, wherein the plurality of optimization scheduling modes include a plurality of single-target scheduling modes and a multi-target scheduling mode; S2, establishing an optimization target library, an optimization scheduling constraint library, and an optimization scheduling algorithm library corresponding to the developed optimization scheduling mode; S3, for different scheduling requirements and business scenes, intelligently constructing an optimization scheduling model according to the optimization target library and the optimization scheduling constraint library, and matching an optimization scheduling algorithm suitable for solving the optimization scheduling model from the optimization scheduling algorithm library to generate an optimization scheduling scheme. According to the invention, optimization scheduling modes of a cascade hydropower station group can be intelligently switched according to drainage basin cascade scheduling requirements, and the problem that a traditional power station scheduling mode in the prior art is low in calculation efficiency is solved.

Description

technical field [0001] The invention relates to a dispatching technology of a hydropower station, in particular to an optimal dispatching method for multi-objective multi-mode intelligent switching of a cascade hydropower station group. Background technique [0002] The scientific scheduling and operation of hydropower station groups is the key to ensuring water safety in the basin and power production safety, and giving full play to the comprehensive benefits of hydropower. However, the regulation characteristics, functions and operation requirements of each power station are different, coupled with many influencing factors such as complex boundary conditions, dispatch orders under different periods and working conditions, multi-objective requirements, and dynamically changing water regimes and working conditions, the dispatching of cascade hydropower stations Operation always faces the diversity of states and the complexity of scientific decision-making. The current dispa...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06G06Q10/04G06Q50/06G06F30/20G06F111/04
CPCG06Q10/06312G06Q10/06313G06Q10/04G06Q50/06G06F30/20G06F2111/04
Inventor 朱喜闻昕徐伟曾体健王安东冯欢王俊莉于洁雷芳周金江杜泽新简福贵胡应权先龙忠张玉吉
Owner GUIZHOU WUJIANG HYDROPOWER DEV