Cast-in-situ bored pile slurry curing treatment system and curing outward transportation construction method

A technology of bored piles and solidification treatment, which is applied in the direction of fixed/solidified sludge treatment, sludge treatment, chemical instruments and methods, etc., which can solve the problems of high transportation cost and low efficiency of mud transportation, and improve transportation efficiency , save transportation costs, and facilitate transportation

CN114031249APending Publication Date: 2022-02-11CHINA MCC20 GRP CORP
7 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Current Assignee / Owner
Publication Date
2022-02-11

Smart Images

  • Figure 1
    Figure 1
  • Figure 2
    Figure 2
  • Figure 3
    Figure 3
Patent Text Reader

Abstract

The invention provides a cast-in-situ bored pile slurry curing treatment system and a curing outward transportation construction method. The system comprises a slurry storage tank, a sedimentation tank and an evaporation tank. The sedimentation tank communicates with the slurry storage tank, so that the waste slurry in the slurry storage tank is discharged into the sedimentation tank, the waste slurry is naturally settled in the sedimentation tank, and upper-layer slurry and sediment are obtained; and the evaporation tank is arranged on one side of the sedimentation tank and is used for storing sediments and solidifying the sediments through dry lime. Waste gas slurry in the slurry storage tank is discharged into the sedimentation tank and naturally settled through the sedimentation tank, so that the mud-water separation effect is achieved; and dry lime is adopted for stirring in the evaporation tank to solidify sediment into solidified soil, and then the solidified soil can be transported out of a yard through a soil truck. The system can ensure that on-site slurry is discharged in time and is not influenced by weather during construction; and meanwhile, after the slurry is solidified, the slurry is convenient to transport, the total outward transportation amount is greatly reduced, the transportation efficiency is improved, and the transportation cost is saved.
Need to check novelty before this filing date? Find Prior Art

Description

technical field

[0001] The invention relates to the technical field of pile foundation engineering, in particular to a solidification treatment system for bored cast-in-place pile mud and a construction method for solidification and external transportation. Background technique

[0002] With the rapid development of the construction industry, there are various requirements for pile foundations according to different structural forms. As an important part of pile foundation engineering, bored piles have high bearing capacity, short construction period, no vibration during construction and It has the advantages of no ground uplift and lateral movement, etc., and is suitable for various geological conditions.

[0003] However, the transportation of mud generated during the construction of bored piles is also a major problem in the construction of bored piles. Traditional mud transportation is inefficient, expensive and difficult to transport. Contents of the invention [000...

Examples

Embodiment Construction

[0022] Exemplary embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. Although exemplary embodiments of the present disclosure are shown in the drawings, it should be understood that the present disclosure may be embodied in various forms and should not be limited by the embodiments set forth herein. Rather, these embodiments are provided for more thorough understanding of the present disclosure and to fully convey the scope of the present disclosure to those skilled in the art. It should be noted that, in the case of no conflict, the embodiments of the present invention and the features in the embodiments can be combined with each other. The present invention will be described in detail below with reference to the accompanying drawings and examples.

[0023] Embodiment of curing treatment system:

[0024] see figure 1 , which is a structural block diagram of a bored pile slurry curing treatment system pro...