A technology with high compactness and uniformity, which is applied in the field of building pouring, can solve problems such as reducing the grip force of concrete on steel bars, affecting the quality of concrete molding, and shifting of steel bars, so as to improve the grip force, strength, and quality Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0046] The embodiment of the present invention provides a preprocessing process of prefabricated building materials with high uniformity and high density. The preprocessing process of prefabricated building materials with high uniformity and high density can be obtained through the following preparation steps: Please refer to figure 1 ;
[0047] S1: Crushing: A certain amount of cement, sand, and stone are crushed to form concrete raw materials; the raw materials are crushed to reduce the impact of excessive sand and stone on the quality of concrete in the later stage.
[0048] S2: Mixing: artificial stone made by adding appropriate amount of water and aggregate to concrete cement raw materials, and then uniformly stirring;
[0049] S3: Proportion: cement sand, stone and admixtures have been inspected to meet the requirements of relevant standards. The compounding ratio is: cement: sand: gravel: water = 350:792:1008:200; the cement is ordinary Portland 32.5 cement, cement The...
Embodiment 2
[0062] This embodiment is a further improvement to embodiment 1 on the basis of embodiment 1, please refer to Figure 6 and Figure 7 , in this embodiment, the second vibration assembly 6 includes a second compression spring 601, a hinge 603 and a side plate 604;
[0063] The second compression spring 601 is fixedly installed in the gap between the tray 2 and the concrete mold 3, the side plate 604 is hinged with the upper end of the tray 2 through a hinge 603, and the upper ends of the two sets of side plates 604 are fixedly installed with a third Compression spring 602, the principle of the third compression spring 602 is that one end of the side plate 604 of the two groups is fixedly connected with the outer wall of the concrete mold 3;
[0064] When the vibration force brought by the first vibrating component 5 to the second vibrating component 6, therefore, the thrust in the horizontal direction will be equally divided into the thrust outside the oblique direction. , th...
Embodiment 3
[0066] This embodiment is a further improvement to embodiment 1 on the basis of embodiment 2, please refer to Figure 8 and Figure 9 , the vibrating assembly 4 is arranged in several groups, and is used for vibrating during the molding process of pouring concrete in the concrete mold 3, and is used to reduce the accumulation of stone components in the bottom layer of the concrete mold 3;
[0067] A prefabricated steel bar 7 is installed inside the concrete mold 3 , and the two ends of the prefabricated steel bar 7 collide with the inner walls of the two sets of side plates 604 respectively.
[0068] The vibrating assembly 4 includes a pressure housing 401;
[0069] An elastic plug 402 is mounted on the inner bottom of the pressure housing 401 , and a pressure channel 403 is fixedly installed on the outer wall of the pressure housing 401 , and the pressure channel 403 communicates with the inside of the pressure housing 401 .
[0070] A thimble 404 is installed inside the pr...