Small hydropower station frequency prediction method based on weighted distribution
A technology of frequency prediction and weighted allocation, applied in the field of power system, which can solve the problems of lack of accuracy, large memory space, frequency control, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0027] The present invention will be described in further detail below in conjunction with the accompanying drawings and specific embodiments.
[0028] Such as figure 1 Shown; A small hydropower frequency prediction method based on weighted distribution, including the following steps;
[0029] Step (1). Take the last frequency of the last second of each minute of small hydropower operation as the reference frequency of each minute; record the current value of the reference frequency generated by the operation of small hydropower; store each reference frequency generated every minute separately value.
[0030] Step (2). Set the values of prediction interval C and standard interval A; prediction interval C is the time period of the frequency to be predicted within X minutes after the current time point; standard interval A is close to the time axis of prediction interval C and has a reference frequency Time period; prediction interval C, standard interval A, and X have the s...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 
