Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

CRD construction method and structure suitable for blasting excavation of stratum with soft upper part and hard lower part

A hard ground and construction method technology, which is applied in the construction field of subway interval tunnels and railway tunnels, can solve problems such as increasing the load of cross braces, increasing risks, and endangering structural safety, so as to achieve uniform structural stress, full play of material strength, and structural safety Effect

Pending Publication Date: 2022-03-08
KUNMING SURVEY DESIGN & RES INST OF CREEC
View PDF7 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

When the lower part is excavated by blasting, it will cause damage to the temporary cross braces that have been erected, endangering the safety of the structure, and also causing a waste of engineering materials
In addition, the practice of opening excavation holes on temporary cross braces to meet the needs of climbing steps is not only relatively inefficient, but also, small vehicles walking on the cross braces increase the load on the cross braces and increase the risk
[0004] To sum up, the current CRD method cannot well meet the needs of blasting and excavation in the upper soft and lower hard strata, and we need to propose a new solution to solve the problem.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • CRD construction method and structure suitable for blasting excavation of stratum with soft upper part and hard lower part
  • CRD construction method and structure suitable for blasting excavation of stratum with soft upper part and hard lower part
  • CRD construction method and structure suitable for blasting excavation of stratum with soft upper part and hard lower part

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0030] The following will clearly and completely describe the technical solutions in the embodiments with reference to the drawings in the embodiments of the application. Obviously, the described embodiments are only some of the embodiments of the application, not all of them. Based on the embodiments, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present application.

[0031] Unless otherwise defined, the technical terms or scientific terms used in the embodiments of the present application shall have the usual meanings understood by those skilled in the art. "First", "second" and similar words used in this embodiment do not indicate any order, quantity or importance, but are only used to distinguish different components. "Include" or "comprising" and other similar words mean that the components or objects appearing before the word include the components or objects listed after the ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a CRD construction method and structure suitable for blasting excavation of an upper-soft lower-hard stratum. The CRD construction method comprises the steps of erecting a grating steel frame, temporary vertical supports and temporary transverse supports and spraying early strength concrete. The temporary cross braces of the left and right pilot tunnels are erected behind the upper step tunnel face, and the lag distance is not larger than one time of the tunnel hole diameter; lagging temporary cross braces are replaced by sprayed early strength concrete; the lower step and the upper step are excavated through a micro-step method, and the sprayed early strength concrete between the tunnel face of the lower step and the lagging cross brace is broken during blasting excavation of the lower step; earthwork dug out of the upper step needs to be transported to the lower step through the gap between the tunnel face of the lower step and the lagging cross brace and then carried away from the lower step, and the situation that holes are formed in the cross brace for soil unloading is avoided. The method effectively solves the problem that the cross brace is damaged in CRD blasting excavation of the upper-soft lower-hard stratum and the problem that the upper step is unearthed, ensures engineering safety, accelerates the construction speed and shortens the construction period.

Description

technical field [0001] The invention relates to the construction field of subway interval tunnels and railway tunnels, in particular to a CRD construction method and structure suitable for blasting excavation in upper soft and lower hard strata. Background technique [0002] At present, the CRD method is generally used in uniform Quaternary strata, and mechanical excavation is adopted, which has little effect on temporary cross braces. In conventional CRD method excavation, the upper pilot hole is excavated first, and the temporary steel frame, temporary vertical braces and temporary horizontal braces are erected immediately after the excavation. To achieve a better force. The lower steps are excavated mechanically, and temporary steel frames and temporary vertical braces are erected immediately after excavation. Generally, it is necessary to set the excavation opening at a certain distance on the temporary cross brace, so as to facilitate the excavation of the upper steps...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E21D9/00E21D11/10E21D11/15
CPCE21D9/006E21D11/10E21D11/152Y02E10/20
Inventor 杨陈相孟小伟郑天池方鸿波高骏刘艳陈歆孙庆洁鲁汉银蒋强福伏润航王剑川杨雪斌刘鸿景云萍
Owner KUNMING SURVEY DESIGN & RES INST OF CREEC
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products