Building grading jacking deviation rectifying method
A building and jacking technology, which is applied in the direction of construction and infrastructure engineering, etc., can solve the problems of destroying the internal space and internal structure of the building, affecting the integrity and safety of the building, so as to ensure the integrity and safety of the structure , Improve safety and avoid cracking
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0040] A method for rectifying deviation in graded jacking of buildings, comprising the following steps:
[0041] (1) Analyze the building that needs deviation correction, and determine the setting position of the building jacking point according to the need for deviation correction. The jacking point is set at the bottom of the foundation 5 directly below the shear wall where the vertical settlement of the building occurs On the wall, it is used to jack up the building foundation 5. As a preferred embodiment of the present invention, the shear wall is a load-bearing exterior wall.
[0042] (2) According to the need to correct the overall load of the building, the center of gravity and the setting position of the jacking point, calculate the maximum jacking force of each jacking point through the principle of leverage; at the same time, analyze and calculate the maximum jacking force required for cracking of the foundation 5 of the building to be corrected , according to the ma...
Embodiment 2
[0049] A method for rectifying deviation in graded jacking of buildings, comprising the following steps:
[0050] (1) Analyze the building that needs deviation correction, and determine the setting position of the building jacking point according to the need for deviation correction. The jacking point is set at the bottom of the foundation 5 directly below the load-bearing outer wall where the vertical settlement of the building occurs On the wall, it is used to jack up the building foundation 5.
[0051] (2) According to the need to correct the overall load of the building, the center of gravity and the setting position of the jacking point, calculate the maximum jacking force of each jacking point through the principle of leverage; at the same time, analyze and calculate the maximum jacking force required for cracking of the foundation 5 of the building to be corrected , according to the maximum jacking force of each jacking point and the maximum jacking force required for c...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com