Operation control system, control method and equipment of mountain rail transit train
A technology of rail transit train and operation control, applied in the direction of control system of transportation center, transportation and packaging, automatic system, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0040] figure 1 It is a structural block diagram of an operation control system for mountain rail transit trains provided in Embodiment 1 of the present invention. refer to figure 1 , the operation control system of the mountain rail transit train 10 includes: on-board equipment 20, operation mode control module 30 and a plurality of positioning modules; the operation section of the train 10 includes at least a continuous first section, a transition section and a second section Wherein, the first positioning module 41 is set at the first preset position K1 of the first section, the second positioning module 42 is set at the starting point K0 of the transition section, and the second preset position K2 of the transition section is set The third positioning module 43;
[0041] The on-board device 20 is used to determine the target distance curve S0 according to the traction control mode of the train 10 in the first section when receiving the signal from the first positioning m...
Embodiment 2
[0062] Figure 5 It is a schematic diagram of the switching control of entering the rack section in the AM operation mode provided in Embodiment 2 of the present invention, Figure 6 It is a schematic diagram of switching control for leaving the rack section in the AM operation mode provided in Embodiment 2 of the present invention. On the basis of the first embodiment above, optionally, the operating mode of the train at least includes an automatic driving mode; correspondingly, the operating mode control module includes at least an ATP control unit and an ATO control unit;
[0063] The ATO control unit is used to control the train to slow down to below the preset speed before entering the starting point of the transition section according to the target distance curve, and to control the train to run at a speed below the preset speed in the transition section; the ATP control unit is used for receiving When the switching completion signal is reached, the train is controlled to...
Embodiment 3
[0068] Figure 7 It is a schematic diagram of the switching control of entering the cog rail segment under the CM operation mode provided in the third embodiment of the present invention, Figure 8 It is a schematic diagram of switching control for leaving the cog rail section in the CM operation mode provided in the third embodiment of the present invention. On the basis of the foregoing embodiments, optionally, the operating mode of the train at least includes a manual driving mode under ATP monitoring; correspondingly, the operating mode control module includes at least a DMI display unit and an ATP control unit;
[0069] The DMI display unit is used to display the target distance curve, and send the information to the train driver to reduce the speed below the preset speed according to the target distance curve, and control the train to run at an average speed below the preset speed in the transition section; the ATP control unit is used and controlling the train to switc...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com