Integrated rapid construction method for overwater single-pile single-column foundation trestle platform
A construction method and trestle technology, which is applied in the direction of infrastructure engineering, bridges, sheet pile walls, etc., can solve the problems of small drilling area, large redundant area, poor economic effect, etc., to reduce one-time investment and achieve significant economic benefits , the effect of high space utilization
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0019] An integrated rapid construction method for trestle platforms with single-pile and single-column foundations on water, such as Figure 1-4 shown, including the following steps:
[0020] S1, refer to figure 1 , 2 , Construction of the starting end of the trestle bridge: the starting end 2 of the trestle bridge 1 is erected at the front of the construction of the long-line single-pile and single-column foundation on the water to connect to the land. The starting end 2 is used as a temporary construction site on the water, and also as a construction machine assembly and material stacking site , taking into account the integrated design and construction of the main trestle, supporting trestle and drilling platform of the pile foundation / pier column on the water, which reduces the construction of the pile foundation construction platform and the corresponding supporting trestle, and greatly reduces the one-time investment of the steel structure and the corresponding The co...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 