Method for anchoring prestressed pipeline construction through light positioning support
A technology of prestressed pipes and positioning brackets, which is applied in the erection/assembly of bridges, bridge materials, buildings, etc., can solve the problem of not giving construction methods and other problems, so as to ensure the installation accuracy, save the amount of steel used, and reduce the construction period. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0046] Below in conjunction with accompanying drawing and embodiment the present invention will be further described:
[0047] Such as Figure 1 to Figure 10 As shown, a method for anchoring prestressed pipeline construction using light positioning brackets, the specific steps are:
[0048] S1. Construction scheme design
[0049] Based on the general route of layered construction, considering the influence of concrete hydration heat, the overall stability of positioning bracket 5, and the length of prestressed pipe 6 on anchorage construction, the pouring thickness of each layer of concrete is between 1.5m and 2.5m , the positioning bracket 5 is erected by a cantilever, and is divided into three layers, and each prestressed pipe 6 is divided into three sections combined with the positioning bracket 5;
[0050] S2, positioning bracket 5 standardized design
[0051] In order to meet the joint construction of the positioning bracket 5 and ensure the positioning accuracy of the...