Construction guidance method based on BIM (Building Information Modeling) of rapid construction

A technology of building construction and modeling, applied in the field of construction guidance of BIM models, can solve the problems of delay in construction progress and waste of construction costs, and achieve the effect of improving efficiency, rational arrangement and reducing waste of resources

Active Publication Date: 2022-05-13
中建五局第三建设有限公司
View PDF3 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] Based on the above problems, the present invention provides a construction guidance method based on a rapidly constructed BIM model, which solves the problems of delay in construction progress and waste of construction costs caused by multi-disciplinary coordination of drawings during the construction process, and the present invention provides The drawing modification of the collision point after integration is more reasonable

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction guidance method based on BIM (Building Information Modeling) of rapid construction

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0025] The specific implementation manners of the present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. The following examples are used to illustrate the present invention, but are not intended to limit the scope of the present invention.

[0026] The present invention is a construction guidance method based on a rapidly constructed BIM model, such as figure 1 shown, including the following steps:

[0027] S1. Import the professional construction drawings into the three-dimensional software according to the mechanical and electrical pipelines to generate the professional construction drawing models, including civil construction construction drawing models and mechanical and electrical construction drawing models. The civil construction construction drawing models include structural construction drawing models, architectural construction drawing models, and decoration construction drawing models;

[0028] Am...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a construction guidance method based on a BIM (Building Information Modeling) of rapid construction. The construction guidance method comprises the following steps: importing construction drawings of all professions into three-dimensional software to generate construction drawing models of all the professions, wherein the construction drawing models comprise a civil engineering construction drawing model and an electromechanical construction drawing model; integrating the civil engineering construction drawing models, and screening out collision parts in the civil engineering construction drawing models for optimization to obtain a three-dimensional model of the civil engineering construction drawing; integrating the electromechanical construction drawing models, screening out collision parts of the electromechanical pipelines in the electromechanical construction drawing models, and optimizing the collision parts to obtain a three-dimensional model of the electromechanical construction drawing; integrating the three-dimensional model of the civil engineering construction drawing and the three-dimensional model of the electromechanical construction drawing, and screening out collision parts for optimization to obtain an optimized overall three-dimensional model; the optimized overall three-dimensional model is split into all optimized professional construction models; therefore, the problems that the construction progress is affected and resources and cost are wasted due to multi-specialty coordination of drawings are solved.

Description

technical field [0001] The invention relates to the technical field of BIM and on-site construction, in particular to a construction guidance method based on a rapidly constructed BIM model. Background technique [0002] With the development of urbanization, the society's requirements for architectural quality are also increasing. In the process of construction project management, it involves the project planning decision-making stage, architectural design stage, construction construction stage, completion and operation management stage. During the construction process, multi-professional cooperation is required, and the design institute cannot reasonably integrate the drawings The layout of each major leads to differences in hardcover drawings, architectural drawings, structural drawings, and mechanical and electrical drawings, especially if there is a unilateral change in the drawings later, it will not be reflected in the drawings of other majors; and it is difficult to c...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06F30/13G06Q10/04G06Q50/08G06T19/20
CPCG06F30/13G06Q10/04G06Q50/08G06T19/20G06T2200/04G06T2210/04Y02T10/40
Inventor 刘重阳封政均康小路邹磊张超司慧伟于志伟周欢刘耿华黄治昆
Owner 中建五局第三建设有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products