Offshore oil and gas platform energy system low-carbon operation scheduling method oriented to wind power absorption
An energy system and wind power consumption technology, applied in wind power generation, electrical components, single-grid parallel feeding arrangements, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0014] like figure 1 It shows that in an embodiment of the low -carbon operation scheduling method for the energy system for the wind power platform for wind power, it includes steps:
[0015] The islands sea oil and gas field power grid that is to be evaluated to be evaluated as the target power grid system is regarded as the target power grid system. Through steps S100-S600 to evaluate the wind power bearing capacity of the target power grid system, the gas compressor has been turned on during the operation of the Island Oil and Gas Field Power Grid. Run, in this embodiment, the gas compressor refers to the gas compressor that has been opened in the target grid system.
[0016] When scheduling the power compressor power of the target power grid system, you need to reduce the total power of the gas generator as much as possible without violation of the operating constraints of the gas-gas interconnection system to achieve the purpose of low-carbon operation. , Build a linear plann...
example 2
[0038] The specific settings and verification results of sample 1 and example 2 are following.
example 1
image 3 Among the middle, the island micro -grid system contains four 4.5MW gas generators (G1 ~ G4). Fuel gas can be a mixture of natural gas, anger or the two. The total load of the system is 5.82mW, and the powerless power demand is about 3.5mvar, which does not include two gas compressors. Because the gas compressor is the coupling element of the microcontroller and the gas network, the power demand changes with the vapor fluctuations caused by the output of the offshore wind power. In order to make no contribution to the system, a static no exercise (SVG) was installed on the Platform 4. The fuel gas of the gas generator on the platform 1 and 2 takes the nodes 1 and 7 of the gas network.
[0040] The gas network system includes two gas compressors (C1 ~ C2) and two gas sources (S1 ~ S2). The gas compressor is connected to the parent line 2 and 3 of the micro grid. S1 is a source of gas gas, which mainly meets the needs of natural gas factories; S2 is accompanied by gas source...