Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Goods yard scheduling method and system

A dispatching method and freight yard technology, applied in data processing applications, instruments, calculations, etc., can solve the problems affecting the good management of freight yards, lack of order in management and dispatching, etc., to improve operational efficiency and economic benefits, and improve the level of intelligence , the effect of saving manpower

Pending Publication Date: 2022-06-21
SHANDONG LANGCHAO YUNTOU INFORMATION TECH CO LTD
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Manual scheduling lacks orderliness in the management and scheduling of cargo loading and unloading operations, which is prone to accumulation of cargo and vehicles, which affects the good management of the cargo yard

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Goods yard scheduling method and system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0031] In order to make those skilled in the art better understand the solution of the present invention, the present invention will be further described in detail below with reference to specific embodiments. Obviously, the described embodiments are only some, but not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative efforts fall within the protection scope of the present invention.

[0032] A preferred embodiment is given below:

[0033] like figure 1 As shown, a freight yard scheduling method in this embodiment collects the information of the vehicles to be operated, determines the information of the operation positions of the freight yard in the blockchain, and uses the preset smart contract according to the information of the vehicles to be operated and the information of the operation positions of the freight yard. Determining the scheduled ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to the technical field of goods management, and particularly provides a goods yard scheduling method, which comprises the steps of collecting to-be-operated vehicle information, determining goods yard operation position information in a block chain, determining a scheduled operation position for a to-be-operated vehicle according to the to-be-operated vehicle information and the goods yard operation position information through a preset intelligent contract, and scheduling the to-be-operated vehicle according to the scheduled operation position. And writing the job bit scheduling result into the block chain. Compared with the prior art, by means of the non-tampering property of the block chain technology and the non-tampering property of the scheduling plan, it is guaranteed that goods yard scheduling automation is achieved, manpower is saved, the work efficiency and economic benefits are improved, and the intelligent level of a goods yard warehouse is further improved.

Description

technical field [0001] The invention relates to the technical field of cargo management, and in particular provides a cargo yard scheduling method and system. Background technique [0002] The process of most domestic freight yards is usually to put forward cargo loading and unloading requirements, find suitable truck resources, and schedule time. Secondly, when the truck arrives, the operation is generally carried out on a first-come-first-served basis. Finally, the operation is completed and left. Manual scheduling lacks orderliness in the management and scheduling of cargo loading and unloading operations, and is prone to accumulation of goods and vehicles, which affects the good management of the cargo yard. SUMMARY OF THE INVENTION [0003] The present invention provides a freight yard scheduling method with strong practicability aiming at the shortcomings of the above-mentioned prior art. [0004] A further technical task of the present invention is to provide a ca...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06Q10/06G06Q10/08
CPCG06Q10/06312G06Q10/0633G06Q10/06316G06Q10/08
Inventor 李翔王伟兵宋明明杨海勇马秀丽
Owner SHANDONG LANGCHAO YUNTOU INFORMATION TECH CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products