Method for preassembling anchor chock and hawse pipe in segmented mode
A technology of anchor chain pipes and anchor platforms, which is applied to ships and other directions, and can solve problems such as reducing the time and difficulty of hoisting, length of anchor chain pipes, and difficulty in precise control
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0026] The present invention will be further described below with reference to the accompanying drawings and specific embodiments.
[0027] like Figure 1-Figure 4 As shown, a method for segmented pre-installation of anchor abutments and hawse pipes includes the following steps:
[0028] S1, the bow of the ship is divided into an upper section 3, a middle section 2 and a lower section 1, the upper section 3 includes the bulwark, and the middle section 2 includes the forecastle deck 4 and the whole of the anchorage. The installation position, the lower section 1 includes the main deck 5 after removing the overall installation position of the anchorage; the lower opening of the anchorage 24 is flush and divided into integral sections, and the outer plate between the middle section and the lower section is divided into sections. The segment seam is L-shaped;
[0029] S2, the anchor platform 24 and the anchor chain pipe 23 are pre-installed on the middle section 2, which specifi...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com