Transfer system and method for radioactive solid waste of nuclear power plant
A solid waste and radioactive technology, applied in radioactive purification, nuclear engineering, etc., can solve the problems of violent vibration of the pump body, time-consuming and labor-intensive, blockage, etc., and achieve the effect of smooth transportation, improved transfer efficiency, and not easy to deposit
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0055] Example 1: as figure 1 As shown, a radioactive solid waste transfer system in a nuclear power plant includes a solid waste tank 1, a solid waste conveying pump 2, a water tank 4, a water supply valve 5, a second control valve 6-2, a third control valve 6-3 and a third control valve 6-3. A control valve 6-1. The pump inlet of the solid waste conveying pump 2 is connected to the first outlet of the solid waste tank 1 through the first pipe body 3-1, wherein the first outlet of the solid waste tank 1 is provided with a valve. The valve inlet of the water supply valve 5 is connected to the water outlet of the water tank 4 through the second pipe body 3-2, and the valve outlet of the water supply valve 5 is connected to the first pipe body 3-1 through the third pipe body 3-3 connect. The valve inlet of the second control valve 6-2 is connected to the pump outlet of the solid waste conveying pump 2 through the fourth pipe body 3-4, and the valve outlet of the second control...
Embodiment 2
[0064] Embodiment 2, a transfer system for radioactive solid waste in a nuclear power plant, differs from Embodiment 1 in that the transfer system further includes a stirring device connected to the first pipe body 3-1.
[0065] like figure 2 and image 3 As shown, the stirring device includes a housing 9-1, a first bearing 9-2, a second bearing 9-3, a stirring shaft 9-4, a stirring motor 9-5 and a stirring blade 9-6.
[0066] The casing 9-1 is provided with a casing cavity 9-1a and two cavity ports 9-1b communicating with the casing cavity 9-1a. The first pipe body 3-1 is formed by connecting a plurality of pipe sections. In this embodiment, a plurality of stirring devices can be provided, and each stirring device can be installed at the connection of any two adjacent pipe sections. The first port 9-1b of 1 is used to connect with the first pipe section, the second port 9-1b is used to connect with the second pipe section, and the two ports 9-1b can be arranged horizontall...
Embodiment 3
[0073] Embodiment 3: A method for transporting radioactive solid waste from a nuclear power plant, comprising the following steps
[0074] First, before the start-up stage: close the valve of the first outlet of the solid waste tank 1, the second control valve 6-2 and the third control valve 6-3, open the water supply valve 5 and the first control valve 6-1, and start Solid waste transfer pump 2. The first pipe body 3-1, the fourth pipe body 3-4, the sixth pipe body 3-6, the seventh pipe body 3-7 and the fifth pipe body 3-5 are cleaned with water, and the solid waste tank is cleaned at the same time. 1 Add a certain amount of water. After a certain period of time, the solid waste delivery pump 2, the water supply valve 5 and the first control valve 6-1 are closed.
[0075] Secondly, before the start-up stage, it also includes: starting the solid waste mixing pump 8; after a certain period of time, closing the solid waste mixing pump 8.
[0076] Specifically, the solid waste...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


