Green detection method and system for underground pipe gallery fabricated structure
An underground pipe gallery and prefabricated technology, applied in the field of data processing, can solve problems such as waste of energy consumption, inability to control the quality of energy data, hidden dangers of accidents, etc., and achieve the effect of improving accuracy
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0027] Please see attached figure 1 , The present invention provides a green detection method for an underground pipe gallery prefabricated structure, the method specifically includes the following steps:
[0028] Step S100: building a distributed corridor warehouse monitoring system, the distributed corridor warehouse monitoring system includes a data acquisition unit, a data analysis unit and an abnormality early warning unit;
[0029] Step S200: Based on the BIM technology, simulation modeling is performed on each cabin assembly area of the underground pipe gallery in the target city, and a three-dimensional three-dimensional simulation environment of the underground pipe gallery in the target city is generated;
[0030] Specifically, the underground integrated pipe gallery, as the lifeline project of the city, implements the new concept of green city development. The emergence of the comprehensive pipe gallery gradually eliminates the spider web-like overhead lines of t...
Embodiment 2
[0081] Based on the same inventive concept as the green detection method of the prefabricated structure of the underground pipe gallery in the foregoing embodiment, the present invention also provides a green detection system of the prefabricated structure of the underground pipe gallery. Please refer to the appendix Figure 4 , the system includes:
[0082] a first building unit 11, the first building unit 11 is used to build a distributed corridor warehouse monitoring system, and the distributed corridor warehouse monitoring system includes a data acquisition unit, a data analysis unit, and an abnormality early warning unit;
[0083] The first modeling unit 12, the first modeling unit 12 is used to simulate and model each cabin assembly area of the underground pipe gallery of the target city based on the BIM technology, and generate a three-dimensional three-dimensional simulation of the underground pipe gallery of the target city surroundings;
[0084] a first collection...