Bridge steel pipe arch rib integral lifting and anchoring device and construction method thereof
A steel tube arch rib and overall lifting technology, applied in the direction of bridges, bridge construction, bridge forms, etc., can solve the problem of not being able to achieve effective and stable overall lifting of the arch rib, and achieve enhanced local stability, good economic benefits, and reduced material consumption. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0040] An integral lifting and anchoring device for a bridge steel tube arch rib. A number of horizontal anchoring upper chord pipes 41 are arranged between the upper chord tubes 31 on both sides of the arch rib, and horizontal anchoring lower chord tubes 42 are arranged between the lower chord tubes 33 on both sides of the corresponding position. , the upper anchoring pipe 41 and the lower anchoring pipe 42 are connected by a plurality of vertical connecting rods 5; the middle point of the upper anchoring pipe 41 is provided with a vertical sling hole, and the side wall of the sling hole is a steel sleeve 44 , the sling 1 passes through the sling hole and is anchored at the bottom of the hole through the anchor 6 to achieve suspension, and the anchoring lower pipe 42 is a tie rod anchoring member.
[0041] A cushion block 43 is arranged at the bottom of the sling hole, and the sling hole penetrates the center of the cushion block 43 .
[0042] The inner cavity of the anchorin...