Method for determining bidding electric quantity boundary of cascade hydropower station group participating in day-ahead spot market

A cascaded hydropower station group and a technology to determine the method, which is applied in the fields of electric power market, hydropower dispatching and power grid operation, can solve the problems of difficult execution of transaction results, achieve the effects of ensuring rationality and feasibility, improving solution speed, and reducing risks

Pending Publication Date: 2022-08-05
CHINA SOUTHERN POWER GRID COMPANY +1
View PDF0 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0007] The technical problem to be solved by the present invention is to provide a method for determining the boundary of bidding electricity for cascade hydropower station groups participating in the day-ahead spot market, in order to improve the efficiency of hydropower participating in spot clearing, and to avoid transaction results caused by the mismatch between upstream and downstream bids for cascade hydropower clearing difficult to implement

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method for determining bidding electric quantity boundary of cascade hydropower station group participating in day-ahead spot market
  • Method for determining bidding electric quantity boundary of cascade hydropower station group participating in day-ahead spot market
  • Method for determining bidding electric quantity boundary of cascade hydropower station group participating in day-ahead spot market

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0041] The present invention is further described below with reference to the accompanying drawings and examples, mainly including three parts: modeling, solution method and practical application of the bidding power boundary of cascade hydropower participating in the spot market before the day.

[0042] 1. Modeling method of day-ahead marketization boundary conditions

[0043] (1) Determine the electricity bidding range—absolutely feasible range

[0044] In order to simplify the close hydraulic connection between the upstream and downstream of the cascade hydropower station, the present invention proposes the concept of an absolutely feasible interval. The specific analysis is as follows:

[0045] When the average outflow flow of the upstream hydropower station m is the maximum value When , the variation interval of the power generation water volume of the downstream hydropower station n is: The corresponding range of power generation changes is: where:

[0046]

...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to the field of electric power markets, hydropower dispatching and power grid operation, and discloses a bidding electric quantity boundary determination method for a cascade hydropower station group participating in a day-ahead spot market. With continuous improvement of electric power spot market construction in China, participation of water and electricity in the spot market is imperative. In the electricity market, clearing efficiency is related to safe and stable operation of a power grid. In order to solve the problems that a spot clearing model is complex, clearing efficiency is low, water abandoning is easily caused when water and electricity participate in a spot market, and transaction results are difficult to execute due to complex hydraulic connection of cascade upstream and downstream reservoirs, day-ahead marketization boundary conditions of cascade hydropower stations are determined, and the concept of absolute feasible electric quantity intervals of the hydropower stations is provided; the evolution rule that the electricity boundary of the cascade hydropower station changes along with the power generation water volume is disclosed, the problem that upstream and downstream power stations are not matched is completely avoided, the solving efficiency of the clearing model is improved, and a feasible thought is provided for market operators to manage water and electricity to participate in the spot market.

Description

technical field [0001] The invention relates to the fields of electric power market, hydropower dispatching and power grid operation, in particular to a method for determining the boundary of bidding electric quantity in which cascaded hydropower station groups participate in the spot market before the day. Background technique [0002] With the continuous improvement of the construction of my country's electricity spot market, it is imperative for hydropower to participate in the spot market. Unlike other power sources such as thermal power, hydropower's participation in the spot market mainly faces the following problems: [0003] 1) Difficulty in matching upstream and downstream bids in hydropower spot transactions: that is, because the cascade upstream and downstream power stations may belong to different entities, but the hydraulic connection is closely coupled, resulting in more competition for upstream power plants and less competition for downstream power plants, res...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q30/02G06Q50/06G06K9/62G06F30/27G06F111/04
CPCG06Q30/0283G06Q30/0201G06Q30/0202G06Q50/06G06F30/27G06F2111/04G06F18/23Y04S50/14
Inventor 李树山吴慧军李崇浩唐红兵程春田刘添廖胜利马翔宇
Owner CHINA SOUTHERN POWER GRID COMPANY
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products