Compensation method for expanding with heat and contracting with cold of underground gasifying furnace perforated pipe
A technology of underground gasification, thermal expansion and cold contraction, applied in the direction of coal gasification, underground mining, construction, etc., can solve the problems of high price, unbearable compensator, large compensation amount, etc., and achieve the effect of high price
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0039] Figure 1 shows that when the thickness of the surface soil layer is large, the thickness is > 30m, or the maximum expansion and contraction of the telescopic section S on the hole tube is > 60mm, and there is a quicksand layer and groundwater affecting the drilling project, the intake and exhaust hole pipes of the underground gasifier 4 Installation situation in borehole 8. The inlet and outlet pipes 4 of the underground gasifier are also referred to as the pipes 4 for short.
[0040] The inlet and outlet holes 8 of the underground gasifier are drilled on the ground, and after connecting with the airflow passages 8 at both ends of the underground gasifier, the inlet and outlet pipes 4 are installed along the depth of the entire borehole 8. And pour cement mortar 7 between hole pipe 4 and borehole 8 hole walls. In the process of installing the hole pipe 4, at first according to the geological data of the inlet and outlet boreholes 8, such as: the lithology and thickness...
Embodiment 2
[0052] Figure 9 shows the installation situation of the hole pipe 4 in the borehole 8 when the thickness of the topsoil layer is large, the thickness>30m, or the maximum expansion and contraction of the telescopic section S on the hole pipe>60mm, no quicksand layer and groundwater affect the drilling project. Now, the installation method of bore pipe 4 in borehole 8 is basically the same as that of embodiment 1, the difference is that the installation of sleeve pipe 2 is added outside the upper end of bore pipe 4: the lower end of sleeve pipe 2 will go deep into the surface 3 below the surface. Less than 1m, pour concrete foundation around the casing 2, fix the fixed plate welded on the casing 2 with anchor bolts; the inner wall of the casing 2 is not connected with the hole pipe 4, and reserve The maximum elongation of the telescopic section S on the outlet pipe. At this time, the lower end of the casing 2 does not have to go deep into the bedrock. The bushing 2 shown in the...
Embodiment 3
[0054] Figure 10 shows the installation situation of the bore pipe 4 in the borehole 8 when the thickness of the topsoil layer is small, the total thickness<10m, or the maximum expansion and contraction amount of the telescopic section S on the bore pipe<20mm. The topsoil layer may contain quicksand layer. At this time, because the telescopic section S on the orifice pipe is very small and the fixed section G is relatively upward, the orifice pipe 4 and the ground pipeline 1 can be directly connected without adding a casing 2 . All the other are identical with embodiment 1.
[0055] When the thickness of the surface soil layer is 10-30m, or the maximum expansion and contraction of the telescopic section S on the hole pipe is between 20-60mm, it can be flexibly controlled according to the complexity of the ground pipeline and the temperature of the hole pipe. . When the surface pipeline is complex, the temperature of the hole pipe is high, and the requirements for the uplift ...