An immersed tube tunnel and construction method technology, which is applied in the field of construction engineering, can solve the problems of inconvenient installation, high precision requirements of hydraulic crimping of joints, and inability to bear the tension of water-stop pads of pipe joints, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0026] Provide following construction example in conjunction with content of the present invention:
[0027] The immersed tube section in the middle of the river of an immersed tube tunnel project is 395m long and consists of four sections, one of which is 95m long and the other three sections are all 100m long. The four pipe sections are lowered on the pile foundation from the north bank of the river to the south bank of the river in turn. Among them, the E1 pipe section is lowered first and connected with the connecting well in the north of the river, then the E2 and E3 pipe sections located in the middle of the river are lowered and connected, and finally the south bank dock is lowered. E4 pipe section at the mouth. After the sinking of the pipe section is completed, the mouth of the dry dock is closed by means of cofferdam sealing, and then the water in the dock is discharged into the river. Finally, the final joint is completed under dry construction conditions, that is, ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com