[0042] FIG. 3 shows an example of work instructions displayed on the function panel devices 1a to 1c. In FIG. 3, a menu list is displayed in the left end area. "Processing order", "time period measurement", "loss input" and "result confirmation" are provided as menu items. Workers choose these items arbitrarily.
[0043] A record of processing sequence instructions is prepared for each product number and each process. For example, in Figure 3, the highest layer to the third layer are all used for the same product number (J0105-03100-00), but on each other in the work process (processing numbers: J58478-1, J58480-1 and J58481-1) different. That is, these work orders indicate that three work processes are necessary for the product or part with this product number.
[0044] In addition, "actual measurement (indicated by mark "!")" up to "quantity" is marked for each record (ie, each process), and an end button and an NG button are also provided. Here, the notation "!" indica...
example 2
[0086] Although in the above-mentioned Example 1, the start buttons 21 and 31, the pause buttons 22 and 32, and the end buttons 23 and 33 are provided on the time measurement screen, the present invention is not limited to this form. For example, as shown in FIG. 12 , only the start button 21 and the end button 23 may be provided in the setting time period information input area 20 , and only the start button 31 and the end button 33 may be provided in the processing time period information input area 30 .
[0087] FIG. 13 is a diagram illustrating how an operating time period is measured in Example 2. FIG. Regarding the work to be performed by the workers, description is made with reference to FIG. 5 .
[0088] In the system of Example 2, no pause button is provided. Thus, if one process (eg, process A) is temporarily interrupted while a single worker is executing multiple processes (eg, processes A and B) in parallel, its time measurement involves a problem. Considering th...