High vacuum variable energy cross soft foundation treatment method
A variable energy, high vacuum technology, applied in soil protection, infrastructure engineering, construction, etc., can solve the problems of long construction period, many construction steps, easy to be discharged, etc., and achieve the effect of saving construction time.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0013] The soft soil foundation of a storage yard is reinforced. Soil layer structure: the surface layer is dredged sand about 2m thick, the second layer is silty clay about 2m thick, and the third layer is silty soil about 10-13m thick. The design requires that the bearing capacity of the foundation within 10m should be increased from an average of 50-60kpa to 130kpa, and the uneven settlement should be less than 1 / 600. For this reason, the soft foundation is cross-processed by "three times the surface layer, the second layer and the third layer are divided into three layers and directly inserted into high-vacuum tubes with different spacings to evacuate and three times variable energy densification":
[0014] The first step, the first time to insert vacuum tubes First, insert the first batch of vacuum tubes directly into the bottom of the surface blow-fill sand layer in an array. The vacuum tube insertion depth is 2m, and the distance between vacuum tubes is 3.5m×6m. On the...
Embodiment 2
[0025] Soft soil reinforcement of a certain road. Soil layer structure: the surface layer is silty clay with a thickness of about 2m and a water content of 45%. The second layer is muddy soil with a thickness of about 10-13m, a water content of 60%, and a permeability coefficient of 1.4×10 -7 cm / s. The design requires that the bearing capacity of the foundation within 6m be increased from an average of 30-40kpa to 80kpa. For this reason, the soft foundation is cross-processed by "three times of shallow and deep layered direct array insertion of high vacuum tubes with different spacing and three times of variable energy densification":
[0026] The first step, the first time to insert the vacuum tubes. First, insert the first batch of vacuum tubes directly into the bottom of the silty clay layer on the surface. The depth of the vacuum tubes is 2m, and the distance between the vacuum tubes is 3.5m×4.5m. The upper and lower parts of the vacuum tube wall section of the first la...
PUM
Property | Measurement | Unit |
---|---|---|
Carrying capacity | aaaaa | aaaaa |
Permeability coefficient | aaaaa | aaaaa |
Carrying capacity | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com