The application provides a conflict
processing structure of a newly-built rainwater pipeline and an existing pipeline and a construction method thereof, which comprises an interaction well arranged at the intersection of the newly-built rainwater pipeline and the existing pipeline, an opening is arranged on the side wall of the interaction well, the opening is penetrated by the existing pipeline, and a stress compensation space is formed between the opening and the existing pipeline, a sleeve
pipe is sleeved outside the pipeline, and a side wall closing element is arranged outside the interaction well to close the opening. The opening with the stress compensation space is arranged on the side wall of the interaction well, the existing pipeline penetrates the well chamber in a non-
contact mode, and the load transmission path between the interaction well structure and the existing pipeline is completely
cut off. The decoupling design can effectively absorb and isolate the stress generated by the well chamber settlement, construction disturbance and external ground dynamic load, avoid displacement, deformation or
cracking of the existing pipeline caused by stress
coupling, and ensure the absolute safety of the existing pipeline.