Field bus based electric energy computing system
A field bus, power calculation technology, applied in electric vehicles, electrical devices, electrical components, etc., can solve problems such as unreasonable and uneconomical substation resources
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0011] Embodiment 1: In this embodiment, the electric energy calculation system based on the field bus of the present invention includes a plurality of electric energy metering sub-stations, and there are field bus communication sub-stations in the plurality of electric energy metering sub-stations, and are connected to the Field bus communication system, wherein, the field bus communication sub-stations in each electric energy metering sub-station share a common sub-station address and can receive information at the same time; each electric energy metering sub-station has a second-layer address coding register, which can save Address coding; only when the address of the substation and the second-layer address code of the electric energy metering substation match, it can send reporting information to the fieldbus communication system through its internal fieldbus communication substation through the communication master station. In this embodiment, when checking whether the lay...
Embodiment 2
[0012] Embodiment 2: In this embodiment, the electric energy meter sub-station also includes a timing setter, which sets the second-layer offset code to automatically respond on time, which can further reduce the occupied time resources.
Embodiment 3
[0013] Embodiment 3: In this embodiment, the electric energy metering substation also includes an automatic switching device. When the second-layer offset code responds on time, within the preset response communication period, the electric energy metering substation is connected to the field bus communication The bus of the system, after the communication is completed, automatically exits the connection with the bus. In this embodiment, the automatic switching device includes a time synchronization device for automatic calibration with the bus clock of the field bus communication system. And the electric energy metering sub-station is connected to the bus of the field bus communication system through its internal field bus communication sub-station through the communication master station. In this way, the occupation of physical resources of the field bus is also minimized.