Current overload and voltage detection in a central point
A mid-point and voltage technology, applied in the field of computer software program products, can solve the problem of additional occupation of integrated circuit pins
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0025] Figure 1a A first exemplary embodiment of the invention is shown in which a DC mains voltage 3 is transmitted to an inverter 10 with a half bridge circuit 5 . The half-bridge circuit 5 has two power switches 1 and 2 , to which in each case freewheeling diodes 11 and 12 are connected in parallel. These freewheeling diodes 11 and 12 can also be integrated into switches (transistors). By suitable (high-frequency) timing of switches 1 and 2 by means of control unit 6, an (high-frequency) alternating voltage can be generated at midpoint 4 of half-bridge circuit 5, which can be transmitted, for example, to a subsequent load circuit In the choke coil 13, the load circuit usually includes a lamp.
[0026] The role of the monitoring circuit connected to the half-bridge circuit 5 is, on the one hand, to avoid so-called hard switching, that is, non-low potential switching transistors 1 and 2 . Before the switch is turned on, the switch switches at low potential when the freewhe...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 