United accident-prevention rehearse method for provincial and city power system

A power system and anti-accident technology, applied in the field of power system scheduling automation and simulation, can solve problems such as difficult model maintenance, impracticality, and no implementation technology given

Inactive Publication Date: 2007-10-17
TSINGHUA UNIV
View PDF0 Cites 24 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0009] Among them, Option 1 is the method commonly used at present, using independent provincial and regional DTS to conduct exercises, and then relying on manual adjustments, it can only achieve an effect similar to a sand table demonstration, without coordination between power grids, the degree of fidelity is not high it is good
Scheme 2 has something in c

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • United accident-prevention rehearse method for provincial and city power system
  • United accident-prevention rehearse method for provincial and city power system
  • United accident-prevention rehearse method for provincial and city power system

Examples

Experimental program
Comparison scheme
Effect test

Example Embodiment

[0056] The joint anti-accident exercise method for provincial and local power systems proposed in the present invention includes the following steps:

[0057] (1) The provincial power grid dispatch center uses the state estimation method to automatically generate initial power flow parameters based on the real-time data of the provincial power grid, including the provincial power grid topology, the active and reactive power of the provincial power grid load, and the provincial power grid generator The active power, reactive power and voltage of the power grid, the bus voltage of the provincial power grid and the active power and reactive power of the line, and the active power, reactive power of the transformer, and the transformer separate gears, and the above-mentioned initial power flow parameters are sent through the wide area network To all-level grid dispatching centers;

[0058] (2) Based on the real-time data of the prefecture-level power grid, the prefecture-level power g...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention suggested combination anti-accident maneuver method of provincial and prefectural two-stage power system, pertains to the power system dispatching automation and simulation technology. First of all provincial power network dispatching centers and prefectural network dispatching centers automatically generate initial power flow parameters according to their own power network real-time data, the provincial dispatching centers send the data to the prefectural dispatching centers; the prefectural dispatching centers correct the prefectural power network flow distribution after receiving the parameters, after the power network disturbance occurred, the provincial dispatching centers and the prefectural dispatching centers respectively send their flow parameters data after being changed to the other party, and correct the respective states. The method has the advantages that: the provincial and the prefectural dispatching centers can reflect mutually the impact of their own power network model changes on the other side, and ensure the fidelity of the combination anti-accident maneuver; only a small number of key information is exchanged between the provincial and the prefectural dispatching centers; and the provincial and the prefectural dispatching centers can independently conduct the combination anti-accident maneuver, which is a kind of decoupling mode and has a in high availability of their own system.

Description

technical field [0001] The invention relates to a joint anti-accident exercise method for provincial and local power systems, and belongs to the technical field of power system scheduling automation and simulation. Background technique [0002] The power grid is composed of multiple regional power grids interconnected as a whole, and the impact on the power grid after an accident occurs is global; while the dispatch and control of the power grid are usually hierarchical, hierarchical, and independently carried out. Provincial and regional dispatch centers are very important two-level dispatch, and dispatchers at these two levels need to coordinate and cooperate with each other in daily operation dispatch and accident handling. The dispatcher training simulation system (DTS) is an important technical means for training dispatchers and anti-accident drills. [0003] Limited by the progress of computer technology and distributed computing research, the joint anti-accident dril...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): H02J3/00H02J13/00
Inventor 吴文传张伯明孙宏斌王鹏
Owner TSINGHUA UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products