Negative pressure well cementing system and control method thereof
A negative pressure cementing and well cementing technology, which is applied in earthwork drilling, wellbore/well components, sealing/isolation, etc., can solve the problem of cementing that cannot reach the liner 3, it is difficult to flow back, and it is impossible to go back up and other problems to achieve the effect of solving cementing problems and improving cementing quality
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0041] Figure 3 is a schematic diagram of the negative pressure cementing system of the first embodiment of the present invention, the negative pressure cementing system of the present invention includes: drill pipe 1, liner hanger 2, liner 3, pouring device 4, well sealing device 5. Sonar depth sounder 6, fluid flowmeter 7, gas flowmeter and pressure sensor 8, pressure relief valve 9, gas compression device 10 and computer 11, drill pipe 1, liner hanger 2 and liner 3 are used in sequence Threaded connection, the filling device 4 is connected with the drill pipe 1, the sonar depth sounder 6 is placed on the ground near the wellhead, the fluid flow meter 7 is installed on the pipeline between the filling device 4 and the drill pipe 1, and the pressure relief valve 9. The gas compression device 10, the gas flow meter and the pressure sensor 8 are connected in turn through the pipeline, the gas flow meter and the pressure sensor 8 are connected with the sealing device 5 through th...
Embodiment 2
[0053] Embodiment 2 is basically the same as Embodiment 1, except that the filling device 4 is connected with the drill pipe 1, and the gas compression device 10 is connected with the sealing device 5. The specific content is shown in Figure 8. A negative pressure cementing device of the present invention Well system, which includes: drill pipe 1, liner hanger 2, liner 3, injection device 4, well sealing device 5, sonar depth sounder 6, fluid flow meter 7, gas flow meter and pressure sensor 8, Pressure relief valve 9, gas compression device 10 and computer 11, drill pipe 1, liner hanger 2 and liner 3 are connected sequentially, filling device 4 is connected with sealing device 5 through pipelines, and sonar sounder 6 is placed on On the ground near the well, the fluid flow meter 7 is installed on the pipeline between the filling device 4 and the well sealing device 5, the pressure relief valve 9, the gas compression device 10, the gas flow meter and the pressure sensor 8 are co...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 